12 . 06 Delay Damages <br /> B . OWNER shall empley and pay fGF the <br /> A . In no event shall OWNER or ENGINEER be Ges of an independent testing labaratery to <br /> liable to CONTRACTOR , any Subcontractor, any <br /> Supplier, or any other person or organization , or to by the Q0RtFaGt DOGUFAents eXiGept. <br /> any surety for or employee or agent of any of them , <br /> for damages arising out of or resulting from : <br /> Govered by paragraphs 13 , 03 , G and 13 , 03 , D <br /> 1 . delays caused by or within the below; <br /> control of CONTRACTOR ; or <br /> 2 , that Gc) stG ' RGUFred in Gennel3tion we <br /> 2 . delays beyond the control of both <br /> OWNER and CONTRACTOR including but not paFagraph 13 . 04 . 13 shall be paid as provided in <br /> limited to fires , floods , epidemics , abnormal said paFagFaph 13 . 04 . 13 ; and <br /> weather conditions , acts of God , or acts or <br /> neglect by utility owners or other contractors <br /> performing other work as contemplated by the Gontral3t DOGUrnentls , <br /> Article 7 , <br /> C . If Laws or Regulations of any public body <br /> B . Nothing in this paragraph 12 . 06 bars a having jurisdiction require any Work (or part thereof) <br /> change in Contract Price pursuant to this Article 12 to specifically to be inspected , tested , or approved by an <br /> compensate CONTRACTOR due to delay, employee or other representative of such public body, <br /> interference , or disruption directly attributable to CONTRACTOR shall assume full responsibility for <br /> actions or inactions of OWNER or anyone for whom arranging and obtaining such inspections , tests , <br /> or <br /> OWNER is responsible . approvals , pay all costs in connection therewith , and <br /> furnish ENGINEER the required certificates of inspec- <br /> ARTICLE 13 - TESTS AND INSPECTIONS ; tion or approval . <br /> CORRECTION , REMOVAL OR ACCEPTANCE OF D . CONTRACTOR shall be responsible for <br /> DEFECTIVE WORK arranging and obtaining and shall pay all costs in <br /> connection with any inspections , tests , or approvals <br /> required for OWNER Is and ENGINEER ' s acceptance <br /> 13 . 01 Notice of Defects of materials or equipment to be incorporated in the <br /> Work; or acceptance of materials , mix designs , or <br /> A. Prompt notice of all defective Work of which equipment submitted for approval prior to <br /> OWNER or ENGINEER has actual knowledge will be CONTRACTOR ' s purchase thereof for incorporation <br /> given to CONTRACTOR . All defective Work may be in the Work . Such inspections , tests , or approvals <br /> rejected , corrected , or accepted as provided in this shall be performed by organizations acceptable to <br /> Article 13 . OWNER and ENGINEER . <br /> 13 . 02 Access to Work E . If any Work (or the work of others) that is to <br /> be inspected , tested , or approved is covered by LON - <br /> A. OWNER , ENGINEER , ENGINEER ' s Con - TRACTOR without written concurrence of ENGk <br /> sultants , other representatives and personnel of NEER , it must, if requested by ENGINEER , be uncov- <br /> OWNER , independent testing laboratories , and ered for observation . <br /> governmental agencies with jurisdictional interests will <br /> have access to the Site and the Work at reasonable F . Uncovering Work as provided in paragraph <br /> times for their observation , inspecting , and testing . 13 . 03 . E shall be at CONTRACTOR ' s expense unless <br /> CONTRACTOR shall provide them proper and safe CONTRACTOR has given ENGINEER timely notice <br /> conditions for such access and advise them of of CONTRACTOR ' s intention to cover the same and <br /> CONTRACTOR ' s Site safety procedures and ENGINEER has not acted with reasonable prompt- <br /> programs so that they may comply therewith as ness in response to such notice . <br /> applicable . <br /> 13 . 04 Uncovering Work <br /> 13 . 03 Tests and Inspections <br /> A. If any Work is covered contrary to the written <br /> A . CONTRACTOR shall give ENGINEER timely request of ENGINEER , it must , if requested by ENGk <br /> notice of readiness of the Work for all required NEER , be uncovered for ENGINEER ' s observation <br /> inspections , tests , or approvals and shall cooperate and replaced at CONTRACTOR ' s expense . <br /> with inspection and testing personnel to facilitate <br /> required inspections or tests . <br /> 00700 - General Conditions REV 04-07 doc <br /> 00700 - 34 <br /> F \Public Warks\ENGINEERING DIVISION PROJECTS\1142-Misc Culvert Replacements\Admim\bid documenls\00700 - General Conditions REV 04-07 doc <br />