Mm <br /> Q2 . Excavation and Embankment is shown in all Projects on the bid schedule is there a <br /> need for these items ? Please clarify . <br /> A2 . Yes. Our interpretation of the FDOT speciflication 430- 12 (Basis of Payment), <br /> will only cover excavation if existing pipe is removed and replaced with new <br /> pipe approximately at the same location. The proposed culvert work entails <br /> work beyond the limits of the existing culvert and also some canal <br /> excavation. A contractor can elect to price excavation under clearing and <br /> grubbing and embankment under the contract unit price for pipe culvert. <br /> Please note that no additional payments will be made for <br /> excavation/embankment for the proposed work within the limits of the project <br /> if the contractor elects to price excavation/embankment under clearing and <br /> grubbing and the contract unit price for pipe culvert respectively, <br /> Q3 . Project 11426 - There is a water main shown on the plans and in the profile . Is this <br /> going to conflict with the culvert installation ? Please clarify . <br /> A3 . According to the pot hole information the existing 6-inch water main is above <br /> the existing 48-inch CMP. Per cross-section A - 1 on Sheet 7 of 9 we do not <br /> anticipate any conflicts. Please note that the contractor is to support the <br /> existing water main during culvert installation. <br /> Q4 . Project 1142C , D- There is an aerial water main crossing at this culvert replacement . <br /> Based on the existing elevations it appears that the water main will be out of the <br /> ground / Pavement . Please clarify . <br /> A4 . Indian River County Utilities Department will address the water main <br /> adjustment during construction. <br /> Q5 . All Headwall installation locations — How far back on each side of the headwalls do <br /> you want to re-grade the existing swale to transition to the new invert elevation ? Is <br /> this area to be sodded ? <br /> A5 . The toe of the canal will have to be graded 50-feet to the west and east of the <br /> proposed headwalls in all three culvert installation projects (1142B-D) since <br /> the new inverts are lower than the existing canal bottom. The area to be re- <br /> graded will not be required to be sodded. <br /> Q6 . It appears that all areas to be sodded ( Performance Turf) are under stated . Please <br /> clarify . <br /> A6 . The quantities for Performance Turf-Sod (Bahia) pay item 570= 1 =2 have been <br /> changed in the revised Itemized Bid Schedule for Projects 1142B, 1142C and <br /> 1142D. <br /> Q7 . Is there a soils report for the project? If so can it be provided ? <br /> Page 2 of 4 <br /> F:IPublic WorkMENGINEERING DIVISION PROJECTS11142-Misc Culvert ReplacementslAdmimlbid documentslAddendumslAddendum No. 1 04421 <br /> 12. doc <br />