A7 . No, IRC did not perform any soil borings for the design phase. The insitu <br /> soil above the existing culvert can be used as backfill material, but any soil <br /> excavated from the canal bottom will not be used as backfill material. <br /> Q8 . Project 1142B — This project has an item ( P- 1 ) Temporary By- Pass Pump 15000 <br /> GPM . Will Project No . 1142C , & 1142D be required to have a by- pass pump ? If so <br /> it needs to be added to the bid form for those projects . <br /> A8 . The contractor is allowed to have only one road closed at a time, which <br /> means they cannot work on 11426, 1142C and 1142D at the same time, but <br /> the contractor is allowed to work on 1142A or 1142E while working on the <br /> culvert replacements (11426, 1142C and 1142D) . Also, attached with the <br /> subject addendum is the MOT (detour) plan that will be required by Indian <br /> River County Traffic Division during the construction of the culverts. <br /> Attachments . <br /> Maintenance of Traffic Plan Exhibit for 11428 , 1142C and 1142D <br /> Revised Itemized Bid Schedule Dated April 16 , 2012 <br /> Plan Sheet 6 of 9 for projects 1142B , 1142C and 1142D <br /> Page 3 of 4 <br /> FAPublic Public Worksl ENGINEERING DIVISION PROJECTSI 1142-Misc Culvert ReplacementslAdmim l bid docum entslAddendumslAddendum No. 1 0442- <br /> 12. doc <br />