39 . Shop Drawings--All drawings , diagrams , quired to be provided under the Contract Documents .
<br /> illustrations , schedules , and other data or information Work includes and is the result of performing or
<br /> which are specifically prepared or assembled by or for providing all labor, services , and documentation
<br /> CONTRACTOR and submitted by CONTRACTOR to necessary to produce such construction , and
<br /> illustrate some portion of the Work . furnishing , installing , and incorporating all materials
<br /> equipent such
<br /> 40 . Site--Lands or areas indicated in the bydthe Contract Documentsment onstruction , all as required
<br /> Contract Documents as being furnished by OWNER
<br /> upon which the Work is to be performed , including 49 . Work Change Directive--A written
<br /> rights-of-way and easements for access thereto , and statement to CONTRACTOR issued on or after the
<br /> such other lands furnished by OWNER which are Effective Date of the Agreement and signed by
<br /> designated for the use of CONTRACTOR . OWNER and recommended by ENGINEER ordering
<br /> an addition , deletion , or revision in the Work , or
<br /> 41 . Specifications--That part of the Contract responding to differing or unforeseen subsurface or
<br /> Documents consisting of written technical physical conditions under which the Work is to be
<br /> descriptions of materials , equipment, systems , stan - performed or to emergencies . A Work Change
<br /> dards , and workmanship as applied to the Work and Directive will not change the Contract Price
<br />or the
<br /> certain administrative details applicable thereto . Contract Times but is evidence that the parties expect
<br /> that the change ordered or documented by a Work
<br /> 42 . Subcontractor--An individual or entity Change Directive will be incorporated in a subse-
<br /> having a direct contract with CONTRACTOR or with quently issued Change Order following negotiations
<br /> any other Subcontractor for the performance of a part by the parties as to its effect, if any, on the Contract
<br /> of the Work at the Site . Price or Contract Times .
<br /> 43 . Substantial Completion--The time at 50 . Written Amendment--A written statement
<br /> which the Work (or a specified part thereof) has modifying the Contract Documents , signed by
<br /> progressed to the point where , in the opinion of OWNER and CONTRACTOR on or after the
<br /> ENGINEER , the Work (or a specified part thereof) is Effective Date of the Agreement and normally dealing
<br /> sufficiently complete , in accordance with the Contract with the non -engineering or nontechnical rather than
<br /> Documents , so that the Work (or a specified part strictly construction -related aspects of the Contract
<br /> thereof) can be utilized for the purposes for which it is Documents .
<br /> intended . The terms "substantially complete" and
<br /> "substantially completed " as applied to all or part of 1 . 02 Terminology
<br /> the Work refer to Substantial Completion thereof.
<br /> A. Intent of Certain Terms or Adjectives
<br /> 44 , Supplementary Conditions--That part of
<br /> the Contract Documents which amends or 1 . Whenever in the Contract Documents
<br /> supplements these General Conditions . the terms " as allowed , " "as approved , " or terms of
<br /> like effect or import are used , or the adjectives
<br /> 45 . Supplier--A manufacturer, fabricator, " reasonable , " " suitable , " "acceptable , " " proper, "
<br /> supplier, distributor, materialman , or vendor having a " satisfactory , " or adjectives of like effect or import
<br /> direct contract with CONTRACTOR or with any are used to describe an action or determination of
<br /> Subcontractor to furnish materials or equipment to be ENGINEER as to the Work, it is intended that
<br /> incorporated in the Work by CONTRACTOR or any such action or determination will be solely to
<br /> Subcontractor, evaluate , in general , the completed Work for
<br /> compliance with the requirements of and
<br /> 46 . Underground Facilities--All underground information in the Contract Documents and
<br /> pipelines , conduits , ducts , cables , wires , manholes , conformance with the design concept of the com -
<br /> vaults , tanks , tunnels , or other such facilities or pleted Project as a functioning whole as shown or
<br /> attachments , and any encasements containing such indicated in the Contract Documents ( unless there
<br /> facilities , including those that convey electricity , is a specific statement indicating otherwise) . The
<br /> gases , steam , liquid petroleum products , telephone or use of any such term or adjective shall not
<br /> be
<br /> other communications , cable television , water, effective to assign to ENGINEER any duty or
<br /> wastewater, storm water, other liquids or chemicals , authority to supervise or direct the performance of
<br /> or traffic or other control systems . the Work or any duty or authority to undertake
<br /> responsibility contrary to the provisions of
<br /> 47 . Unit Price Work--Work to be paid for on paragraph 9 . 10 or any other provision of the
<br /> the basis of unit prices . Contract Documents .
<br /> 48 . Work--The entire completed construction B . Day
<br /> or the various separately identifiable parts thereof re-
<br /> 00700 - General Conditions REV 04-07. doc
<br /> 00700 - 7
<br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\1142-Misc Culvert ReplacemenWtAdmim\bid documents\00700 - General Conditions REV 04-07. doc
<br />
|