My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-091A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-091A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2015 11:49:59 AM
Creation date
10/1/2015 4:24:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
05/22/2012
Control Number
2012-091A
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents and Specifications
Drainage Culvert Replacements
Area
7th Ave. SW 17th Lane SW
Project Number
1142
Bid Number
2012037
Supplemental fields
SmeadsoftID
11159
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . The word "day" shall constitute a ARTICLE 2 - PRELIMINARY MATTERS <br /> calendar day of 24 hours measured from <br /> midnight to the next midnight. <br /> C . Defective <br /> 2 . 01 Delivery of Bonds <br /> A . When CONTRACTOR delivers the executed <br /> 1 . The word " defective , " when Agreements to OWNER , CONTRACTOR shall also <br /> modifying the word "Work , " refers to Work that deliver to OWNER such Bonds as CONTRACTOR <br /> is unsatisfactory , faulty, or deficient in that it may be required to furnish . <br /> does not conform to the Contract Documents <br /> or does not meet the requirements of any 2 . 02 Copies of Documents <br /> inspection , reference standard , test, or <br /> approval referred to in the Contract Docu - A. OWNER shall furnish to CONTRACTOR up <br /> ments , or has been damaged prior to to ten copies of the Contract Documents . Additional <br /> ENGINEER 's recommendation of final copies will be furnished upon request at the cost of <br /> payment ( unless responsibility for the reproduction , <br /> protection thereof has been assumed by <br /> OWNER at Substantial Completion in accor- 2 . 03 Commencement of Contract Times, Notice <br /> dance with paragraph 14 . 04 or 14 . 05 ) . to Proceed <br /> D . Furnish, Install, Perform, Provide A. The Contract Times will commence to run on <br /> the thirtieth day after the Effective Date of the Agree- <br /> 1 ment or, if a Notice to Proceed is given , on the day <br /> indicated in the Notice to Proceed . A Notice to Pro- <br /> equipment, shall meaR to supply and delive ceed may be given at any time within 30 days <br /> after <br /> the Effective Date of the Agreement. In no event will <br /> the Contract Times commence to run later than the <br /> sixtieth day after the day of Bid opening or the thirtieth <br /> day after the Effective Date of the Agreement, <br /> h cQ� whichever date is earlier, <br /> p The werd " install " .,, � AIn <br /> 2 . 04 Starting the Work <br /> A. CONTRACTOR shall start to perform the <br /> Work on the date when the Contract Times com - <br /> mence to run . No Work shall be done at the Site prior <br /> 44 to the date on which the Contract Times commence <br /> to run . <br /> 2 . 05 Before Starting Construction <br /> aad —install — said — services , materials , er <br /> A. CONTRACTOR's Review of Contract Docu- <br /> ments: Before undertaking each part of the Work , <br /> CONTRACTOR shall carefully study and compare the <br /> 4 . When " furnish , " " install " " perform or Contract Documents and check and verify pertinent <br /> " provide" is not used in connection with services , figures therein and all applicable field measurements , <br /> materials , or equipment in a context clearly CONTRACTOR shall promptly report in writing to <br /> requiring an obligation of CONTRACTOR , ENGINEER any conflict, error, ambiguity, or <br /> " provide" is implied , discrepancy which CONTRACTOR may discover and <br /> shall obtain a written interpretation or clarification from <br /> E . Unless stated otherwise in the Contract ENGINEER before proceeding with any Work <br /> Documents , words or phrases which have a well- affected thereby ; however, CONTRACTOR shall not <br /> known technical or construction industry or trade be liable to OWNER or ENGINEER for failure to <br /> meaning are used in the Contract Documents in report any conflict, error, ambiguity , or discrepancy in <br /> accordance with such recognized meaning . the Contract Documents unless CONTRACTOR <br /> knew or reasonably should have known thereof. <br /> B . Preliminary Schedules: Within ten days after <br /> the Effective Date of the Agreement ( unless otherwise <br /> specified in the General Requirements) , CONTRAC - <br /> TOR shall submit to ENGINEER for its timely review: <br /> 00700 - 8 00700 - General Conditions REV 04-07 . doc <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1142-Misc Culvert Replacements\Admim\bid documents\00700 - General Conditions REV 04-07 . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.