2012-091A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-091A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2015 11:49:59 AM
Creation date
10/1/2015 4:24:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
05/22/2012
Control Number
2012-091A
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents and Specifications
Drainage Culvert Replacements
Area
7th Ave. SW 17th Lane SW
Project Number
1142
Bid Number
2012037
Supplemental fields
SmeadsoftID
11159
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . The progress schedule will be <br /> 1 . a preliminary progress schedule acceptable to ENGINEER if it provides an <br /> indicating the times ( numbers of days or dates ) orderly progression of the Work to completion <br /> for starting and completing the various stages within any specified Milestones and the <br /> of the Work , including any Milestones specified Contract Times . Such acceptance will not <br /> in the Contract Documents ; impose on ENGINEER responsibility for the <br /> progress schedule , for sequencing , scheduling , <br /> 2 , a preliminary schedule of Shop or progress of the Work nor interfere with or <br /> Drawing and Sample submittals which will list relieve CONTRACTOR from CONTRACTOR ' s <br /> each required submittal and the times for sub- full responsibility therefor, <br /> mitting , reviewing , and processing such <br /> submittal ; and 2 . CONTRACTOR ' s schedule of Shop <br /> Drawing and Sample submittals will be <br /> 3 , a preliminary schedule of values for acceptable to ENGINEER if it provides a <br /> all of the Work which includes quantities and workable arrangement for reviewing and <br /> prices of items which when added together processing the required submittals . <br /> equal the Contract Price and subdivides the <br /> Work into component parts in sufficient detail 3 . CONTRACTOR ' s schedule of values <br /> to serve as the basis for progress payments will be acceptable to ENGINEER as to form <br /> during performance of the Work . Such prices and substance if it provides a reasonable <br /> will include an appropriate amount of overhead allocation of the Contract Price to component <br /> and profit applicable to each item of Work , parts of the Work. <br /> the Site is started , CONTRACTOR and OW NE all AMENDING ,NG , RECLE 3 OUSEACT DOCUMENTS : INTENT , <br /> each deliver to the other, with cop o each <br /> additional insured identified in t upplementary <br /> Conditions , certificates of urance (and other 3 . 01 Intent <br /> evidence of insurance ich either of them or any <br /> additional insureay reasonably request) which A. The Contract Documents are comple- <br /> CONTRA and OWNER respectively are mentary; what is called for by one is as binding as if <br /> t9 D r9hase and maintain annerdanne with called for by all . <br /> B . It is the intent of the Contract Documents to <br /> 2 . 06 Preconstruction Conference describe a functionally complete Project (or part <br /> thereof) to be constructed in accordance with the <br /> Contract Documents . Any labor, documentation , <br /> to run , but befwom ' ore any Work at the Site i rted , a services , materials , or equipment that <br /> may <br /> j <br /> nference attended by CONT OR , ENGI - reasonably be inferred from the Contract Documents <br /> ER , and others as appr a will be held to or from prevailing custom or trade usage as being <br /> tablish a 9. required to produce the intended result will be <br /> te-the Work a discuss the schedules referred provided whether or not specifically called for at no <br /> in para r 2 . 05 . 13 , procedures for handling Shop additional cost to OWNER . <br /> aw and other submittals , processing Applica- <br /> ns for C . Clarifications and interpretations of the <br /> Contract Documents shall be issued by ENGINEER <br /> 2 . 07 Initial Acceptance of Schedules as provided in Article 9 . <br /> A. Unless otherwise provided in the Contract 3 . 02 Reference Standards <br /> Documents , at least ten days before submission of <br /> the first Application for Payment a conference A. Standards, Specifications, Codes, Laws, and <br /> attended by CONTRACTOR , ENGINEER , and others Regulations <br /> as appropriate will be held to review for acceptability <br /> to ENGINEER as provided below the schedules 1 . Reference to standards , specifica- <br /> submitted in accordance with paragraph 2 . 05 . 131 tions , manuals , or codes of any technical <br /> CONTRACTOR shall have an additional ten days to society, organization , or association , or to Laws <br /> make corrections and adjustments and to complete or Regulations , whether such reference be <br /> and resubmit the schedules . No progress payment specific or by implication , shall mean the stan - <br /> shall be made to CONTRACTOR until acceptable dard , specification , manual , code , or Laws or <br /> schedules are submitted to ENGINEER . Regulations in effect at the time of opening of <br /> Bids (or on the Effective Date of the <br /> 00700 9 <br /> 00700 - General Conditions REV 04-07 . doc <br /> - <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\ 1142-Misc Culvert ReplacementsV%dmim\bid documents\00700 - General Conditions REV 04-07. doc <br />