1 . The progress schedule will be <br /> 1 . a preliminary progress schedule acceptable to ENGINEER if it provides an <br /> indicating the times ( numbers of days or dates ) orderly progression of the Work to completion <br /> for starting and completing the various stages within any specified Milestones and the <br /> of the Work , including any Milestones specified Contract Times . Such acceptance will not <br /> in the Contract Documents ; impose on ENGINEER responsibility for the <br /> progress schedule , for sequencing , scheduling , <br /> 2 , a preliminary schedule of Shop or progress of the Work nor interfere with or <br /> Drawing and Sample submittals which will list relieve CONTRACTOR from CONTRACTOR ' s <br /> each required submittal and the times for sub- full responsibility therefor, <br /> mitting , reviewing , and processing such <br /> submittal ; and 2 . CONTRACTOR ' s schedule of Shop <br /> Drawing and Sample submittals will be <br /> 3 , a preliminary schedule of values for acceptable to ENGINEER if it provides a <br /> all of the Work which includes quantities and workable arrangement for reviewing and <br /> prices of items which when added together processing the required submittals . <br /> equal the Contract Price and subdivides the <br /> Work into component parts in sufficient detail 3 . CONTRACTOR ' s schedule of values <br /> to serve as the basis for progress payments will be acceptable to ENGINEER as to form <br /> during performance of the Work . Such prices and substance if it provides a reasonable <br /> will include an appropriate amount of overhead allocation of the Contract Price to component <br /> and profit applicable to each item of Work , parts of the Work. <br /> the Site is started , CONTRACTOR and OW NE all AMENDING ,NG , RECLE 3 OUSEACT DOCUMENTS : INTENT , <br /> each deliver to the other, with cop o each <br /> additional insured identified in t upplementary <br /> Conditions , certificates of urance (and other 3 . 01 Intent <br /> evidence of insurance ich either of them or any <br /> additional insureay reasonably request) which A. The Contract Documents are comple- <br /> CONTRA and OWNER respectively are mentary; what is called for by one is as binding as if <br /> t9 D r9hase and maintain annerdanne with called for by all . <br /> B . It is the intent of the Contract Documents to <br /> 2 . 06 Preconstruction Conference describe a functionally complete Project (or part <br /> thereof) to be constructed in accordance with the <br /> Contract Documents . Any labor, documentation , <br /> to run , but befwom ' ore any Work at the Site i rted , a services , materials , or equipment that <br /> may <br /> j <br /> nference attended by CONT OR , ENGI - reasonably be inferred from the Contract Documents <br /> ER , and others as appr a will be held to or from prevailing custom or trade usage as being <br /> tablish a 9. required to produce the intended result will be <br /> te-the Work a discuss the schedules referred provided whether or not specifically called for at no <br /> in para r 2 . 05 . 13 , procedures for handling Shop additional cost to OWNER . <br /> aw and other submittals , processing Applica- <br /> ns for C . Clarifications and interpretations of the <br /> Contract Documents shall be issued by ENGINEER <br /> 2 . 07 Initial Acceptance of Schedules as provided in Article 9 . <br /> A. Unless otherwise provided in the Contract 3 . 02 Reference Standards <br /> Documents , at least ten days before submission of <br /> the first Application for Payment a conference A. Standards, Specifications, Codes, Laws, and <br /> attended by CONTRACTOR , ENGINEER , and others Regulations <br /> as appropriate will be held to review for acceptability <br /> to ENGINEER as provided below the schedules 1 . Reference to standards , specifica- <br /> submitted in accordance with paragraph 2 . 05 . 131 tions , manuals , or codes of any technical <br /> CONTRACTOR shall have an additional ten days to society, organization , or association , or to Laws <br /> make corrections and adjustments and to complete or Regulations , whether such reference be <br /> and resubmit the schedules . No progress payment specific or by implication , shall mean the stan - <br /> shall be made to CONTRACTOR until acceptable dard , specification , manual , code , or Laws or <br /> schedules are submitted to ENGINEER . Regulations in effect at the time of opening of <br /> Bids (or on the Effective Date of the <br /> 00700 9 <br /> 00700 - General Conditions REV 04-07 . doc <br /> - <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\ 1142-Misc Culvert ReplacementsV%dmim\bid documents\00700 - General Conditions REV 04-07. doc <br />