their property. All damage , injury, or loss to any
<br /> property referred to in paragraph 6 . 13 . A. 2 or 6 . 13 . A. 3 6 . 17 Shop Drawings and Samples
<br /> caused , directly or indirectly , in whole or in part, by
<br /> CONTRACTOR , any Subcontractor, Supplier, or any A. CONTRACTOR shall submit Shop Drawings
<br /> other individual or entity directly or indirectly employed to ENGINEER for review and approval in accordance
<br /> by any of them to perform any of the Work , or anyone with the acceptable schedule of Shop Drawings and
<br /> for whose acts any of them may be liable, shall be Sample submittals . All submittals will be identified
<br /> as
<br /> remedied by CONTRACTOR (except damage or loss ENGINEER may require and in the number of copies
<br /> attributable to the fault of Drawings or Specifications specified in the General Requirements . The data
<br /> or to the acts or omissions of OWNER or ENGINEER shown on the Shop Drawings will be complete with
<br /> or ENGINEER 's Consultant, or anyone employed by respect to quantities , dimensions , specified perfor-
<br /> any of them , or anyone for whose acts any of them mance and design criteria , materials , and similar
<br />data
<br /> may be liable , and not attributable , directly or to show ENGINEER the services , materials , and
<br /> indirectly, in whole or in part, to the fault or negligence equipment CONTRACTOR proposes to provide and
<br /> of CONTRACTOR or any Subcontractor, Supplier, or to enable ENGINEER to review the information for the
<br /> other individual or entity directly or indirectly employed limited purposes required by paragraph 6 . 17 . E .
<br /> by any of them ) . CONTRACTOR 's duties and
<br /> responsibilities for safety and for protection of the B . CONTRACTOR shall also submit Samples to
<br /> Work shall continue until such time as all the Work is ENGINEER for review and approval in accordance
<br /> completed and ENGINEER has issued a notice to with the acceptable schedule of Shop Drawings and
<br /> OWNER and CONTRACTOR in accordance with Sample submittals . Each Sample will be identified
<br /> paragraph 14 . 07 . 13 that the Work is acceptable clearly as to material , Supplier, pertinent data such as
<br /> (except as otherwise expressly provided in connection catalog numbers , and the use for which intended and
<br /> with Substantial Completion ) , otherwise as ENGINEER may require to enable
<br /> ENGINEER to review the submittal for the limited
<br /> 6 . 14 Safety Representative purposes required by paragraph 6 . 17 . E . The numbers
<br /> of each Sample to be submitted will be as specified in
<br /> A. CONTRACTOR shall designate a qualified the Specifications .
<br /> and experienced safety representative at the Site
<br /> whose duties and responsibilities shall be the C . Where a Shop Drawing or Sample is required
<br /> prevention of accidents and the maintaining and by the Contract Documents or the schedule of Shop
<br /> supervising of safety precautions and programs . Drawings and Sample submittals acceptable to ENGI -
<br /> NEER as required by paragraph 2 . 07 , any related
<br /> 6 . 15 Hazard Communication Programs Work performed prior to ENGINEER ' s review and
<br /> approval of the pertinent submittal will be at the sole
<br /> A. CONTRACTOR shall be responsible for expense and responsibility of CONTRACTOR .
<br /> coordinating any exchange of material safety data
<br /> sheets or other hazard communication information D . Submittal Procedures
<br /> required to be made available to or exchanged be-
<br /> tween or among employers at the Site in accordance 1 . Before submitting each Shop
<br /> with Laws or Regulations . Drawing or Sample , CONTRACTOR shall
<br /> 6 . 16 Emergencies have determined and verified :
<br /> a , all field measurements , quantities ,
<br /> A . In emergencies affecting the safety or protel dimensions , specified performance criteria ,
<br /> tion of persons or the Work or property at the Site or installation requirements , materials , catalog
<br /> adjacent thereto , CONTRACTOR is obligated to act numbers , and similar information with
<br /> to prevent threatened damage , injury, or loss , respect thereto ,
<br /> CONTRACTOR shall give ENGINEER prompt written
<br /> notice if CONTRACTOR believes that any significant b . all materials with respect to intended
<br /> changes in the Work or variations from the Contract use , fabrication , shipping , handling ,
<br /> Documents have been caused thereby or are storage, assembly , and installation
<br /> required as a result thereof. If ENGINEER pertaining to the performance of the Work ;
<br /> determines that a change in the Contract Documents
<br /> is required because of the action taken by c . all information relative to means ,
<br /> CONTRACTOR in response to such an emergency, a methods , techniques , sequences , and
<br /> Work Change Directive or Change Order will be procedures of construction and safety
<br /> issued , precautions and programs incident thereto ;
<br /> and
<br /> 00700 - 23 00700 - General Conditions REV 04-07 . doc