My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-091A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-091A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2015 11:49:59 AM
Creation date
10/1/2015 4:24:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
05/22/2012
Control Number
2012-091A
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents and Specifications
Drainage Culvert Replacements
Area
7th Ave. SW 17th Lane SW
Project Number
1142
Bid Number
2012037
Supplemental fields
SmeadsoftID
11159
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d . CONTRACTOR shall also have NEER has given written approval of each such <br /> reviewed and coordinated each Shop variation by specific written notation thereof <br /> Drawing or Sample with other Shop incorporated in or accompanying the Shop <br /> Drawings and Samples and with the Drawing or Sample approval ; nor will any <br /> requirements of the Work and the Contract approval by ENGINEER relieve CON - <br /> Documents . TRACTOR from responsibility for complying <br /> with the requirements of paragraph 6 . 17 . D . 1 . <br /> 2 . Each submittal shall bear a stamp or <br /> specific written indication that CONTRACTOR F . Resubmittal Procedures <br /> has satisfied CONTRACTOR ' s obligations <br /> under the Contract Documents with respect to 1 . CONTRACTOR shall make correc- <br /> CONTRACTOR ' s review and approval of that tions required by ENGINEER and shall return <br /> submittal . the required number of corrected copies of <br /> Shop Drawings and submit as required new <br /> 3 . At the time of each submittal , CON - Samples for review and approval . CON - <br /> TRACTOR shall give ENGINEER specific TRACTOR shall direct specific attention in <br /> written notice of such variations , if any , that the writing to revisions other than the corrections <br /> Shop Drawing or Sample submitted may have called for by ENGINEER on previous <br /> from the requirements of the Contract submittals . <br /> Documents , such notice to be in a written com- <br /> munication separate from the submittal ; and , in 6 . 18 Continuing the Work <br /> addition , shall cause a specific notation to be <br /> made on each Shop Drawing and Sample sub- A. CONTRACTOR shall carry on the Work and <br /> mitted to ENGINEER for review and approval adhere to the progress schedule during all disputes or <br /> of each such variation , disagreements with OWNER . No Work shall be <br /> delayed or postponed pending resolution of any <br /> E . ENGINEER 's Review disputes or disagreements , except as permitted by <br /> paragraph 15 . 04 or as OWNER and CONTRACTOR <br /> 1 . ENGINEER will timely review and may otherwise agree in writing . <br /> approve Shop Drawings and Samples in <br /> accordance with the schedule of Shop 6 . 19 CONTRACTOR 's General Warranty and <br /> Drawings and Sample submittals acceptable to Guarantee <br /> ENGINEER . ENGINEER 's review and <br /> approval will be only to determine if the items A. CONTRACTOR warrants and guarantees to <br /> covered by the submittals will , after installation OWNER , ENGINEER , and ENGINEER ' s Consultants <br /> or incorporation in the Work , conform to the that all Work will be in accordance with the <br /> Contract <br /> information given in the Contract Documents Documents and will not be defective . <br /> and be compatible with the design concept of CONTRACTOR ' s warranty and guarantee hereunder <br /> the completed Project as a functioning whole excludes defects or damage caused by: <br /> as indicated by the Contract Documents . <br /> 1 . abuse , modification , or improper <br /> 2 . ENGINEER 's review and approval maintenance or operation by persons other <br /> will not extend to means , methods , techniques , than CONTRACTOR , Subcontractors , <br /> sequences , or procedures of construction Suppliers , or any other individual or entity for <br /> (except where a particular means , method , whom CONTRACTOR is responsible ; or <br /> technique , sequence, or procedure of con - <br /> struction is specifically and expressly called for 2 , normal wear and tear under normal <br /> by the Contract Documents) or to safety usage . <br /> precautions or programs incident thereto . The <br /> review and approval of a separate item as B . CONTRACTOR 's obligation to perform and <br /> such will not indicate approval of the assembly complete the Work in accordance with the Contract <br /> in which the item functions . Documents shall be absolute . None of the following <br /> will constitute an acceptance of Work that is not in <br /> 3 . ENGINEER ' s review and approval of accordance with the Contract Documents or a release <br /> Shop Drawings or Samples shall not relieve of CONTRACTOR ' s obligation to perform the Work in <br /> CONTRACTOR from responsibility for any accordance with the Contract Documents : <br /> variation from the requirements of the Contract <br /> Documents unless CONTRACTOR has in 1 . observations by ENGINEER , <br /> writing called ENGINEER ' s attention to each <br /> such variation at the time of each submittal as <br /> required by paragraph 6 . 17 . D . 3 and ENGI - <br /> 00700 - General Conditions REV 04-07 . doc <br /> 00700 - 24 <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\ 1142-Misc Culvert Replacements\Admim\bid documents\00700 - General Conditions REV 04-07 . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.