My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-101A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-101A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2015 1:31:44 PM
Creation date
10/1/2015 4:28:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/22/2012
Control Number
2012-101A
Agenda Item Number
12.I.1
Entity Name
Timothy Rose Contracting
Subject
Contract Documents and Specifications
Oslo Road Phase 111 Roadway Improvements
Area
58th Avenue and 43rd Avenue
Project Number
0517
Bid Number
2012036
Supplemental fields
SmeadsoftID
11224
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
It tR <br /> SECTION - 102 = MAINTENANCE OF TRAFFIC <br /> The work specified in this item shall conform to Section 102 of the Florida Department of <br /> Transportation Standard Specifications for Road and Bridge Construction (2010 Edition ) , <br /> except as modified herein . <br /> A . GENERAL PROVISIONS- DESCRIPTION : The work specified in this Section <br /> consists of maintaining traffic within the limits of the project for the duration of the <br /> construction period , including any temporary suspensions of the work . It shall <br /> include the construction and maintenance of any necessary detour facilities ; the <br /> providing of necessary facilities for access to residences , businesses , etc . , along <br /> the project ; the furnishing , installing and maintaining of traffic control and safety <br /> devices during construction , the control of dust through the use of calcium chloride if <br /> necessary , and any other special requirements for safe and expeditious movement <br /> of traffic as may be called for on the plans . The term , Maintenance of Traffic , as <br /> used herein , shall include all of such facilities , devices and operations as are <br /> required for the safety and convenience of the public as well as for minimizing public <br /> nuisance ; all as specified in this Itemized Section 14 of these provisions and <br /> Paragraph 24 in General Conditions Section , <br /> Be BEGINNING DATE OF CONTRACTOR ' S RESPONSIBILITY: The Contractorshall <br /> present his Maintenance of Traffic Plan at the pre-construction conference . The <br /> Maintenance of Traffic Plan shall indicate the type and location of all signs , lights , <br /> barricades , striping and barriers to be used for the safe passage of pedestrians and <br /> vehicular traffic through the project and for the protection of the workmen . The plan <br /> will indicate conditions and setups for each phase of the Contractor' s activities . <br /> When the project plans include or specify a specific Maintenance of Traffic Plan , <br /> alternate proposals will be considered when they are found to be equal to or better <br /> than the plan specified . <br /> In no case may the Contractor begin work until the Maintenance of Traffic Plan has <br /> been approved in writing by the Engineer. Modifications to the Maintenance of <br /> Traffic Plan that become necessary shall also be approved in writing . Except in an <br /> emergency , no changes to the approved plan will be allowed until approval to <br /> change such plan has been received . <br /> The cost of all work included in the Maintenance of Traffic Plan shall be included in <br /> the pay item for Maintenance of Traffic . <br /> The Contractor shall be responsible for performing daily inspections , including <br /> weekends and holidays , with some inspections at nighttime , of the installations on <br /> the project and replace all equipment and devices not conforming with the approved ' <br /> standards during that inspection . The project personnel will be advised of the <br /> schedule of these inspections and be given the opportunity to join in the inspection <br /> as is deemed necessary . <br /> C . TRAFFIC CONTROL - STANDARDS : The FDOT Design Standards For Design <br /> Construction Maintenance and Utility Operations On The State HighwaV System , <br /> 01025-2 Technical Specifications <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0517-OSLO ROAD 43rd Ave to 58th Ave-Phase IIIWdmim\bid <br /> documents\Technical Specifications . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.