Laserfiche WebLink
Edition as dated on the plans set forth the basic principles and prescribes minimum <br /> standards to be followed in the design , application , installation , maintenance and <br /> removal of all traffic control devices and all warning devices and barriers which are <br /> necessary to protect the public and workmen from hazards within the project limits . <br /> The standards established in the aforementioned manual constitute the minimum <br /> requirements for normal conditions , and additional traffic control devices warning <br /> devices , barriers or other safety devices will be required where unusual , complex or <br /> particularly hazardous conditions exist . <br /> The above referenced standards were developed using F . H . W . A . , U . S . D . O . T . <br /> Manual on Uniform Traffic Control Devices ( MUTCD ) . <br /> D . TRAFFIC CONTROL DEVICES WARNING DEVICES AND BARRIERS - <br /> INSTALLATION : The responsibility for installation and maintenance of adequate <br /> traffic control devices , warning devices and barriers , for the protection of the travel <br /> in public and workmen , as well as to safeguard the work area in general shall rest <br /> with the Contractor . Consideration shall be given to recommendations of the <br /> Engineer . The required traffic control devices , warning devices and barriers shall be <br /> erected by the Contractor prior to creation of any hazardous condition and in <br /> conjunction with any necessary re - routing of traffic . The Contractor shall <br /> immediately remove , turn or cover any devices or barriers which do not apply to <br /> existing conditions . All traffic control devices shall conform to MUTCD standards <br /> and shall be clean and relatively undamaged . Damaged devices diminishing r` <br /> legibility and recognition , during either night or day conditions , are not acceptable <br /> for use . <br /> E . NO WAIVER OF LIABILITY : The Contractor shall conduct his operations in such a <br /> manner that no undue hazard will result due to the requirements of this article , and <br /> the procedures and policies described therein shall in no way act as a waiver of any <br /> of the terms of the liability of the Contractor or his surety . <br /> F . Non - Compliance : Should the Owner or Engineer determine that traffic within the <br /> project is not being maintained in accordance with the approved traffic control plan <br /> or presents a public safety concern , the contractor shall have until the end of the <br /> working day , in which notification is given , to take action to modify the maintenance <br /> of traffic . Should the contractor fail to make such modification the Owner shall have <br /> the option to fine the Contractor $ 1000 . 00 per day until remedied . <br /> G . Contractor' s Maintenance of Traffic Plan shall maintain continuous vehicular traffic <br /> on Oslo Road at all times . The Contractor shall maintain one lane of traffic at all <br /> times during Oslo Road cross drain culvert constructions . Owner shall have option <br /> to fine the Contractor $ 1 , 000 . 00 per day for Maintenance of Traffic Plan non - <br /> compliance . <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under : <br /> Bid Item No . 102 - 1 - Maintenance of Traffic - Lump Sum <br /> 01025-3 Technical Specifications <br /> F : \Public Works\ENGINEERING DIVISION PROJECTS\0517-OSLO ROAD_43rd Ave to 58th Ave-Phase III\Admim\bid <br /> documents\Technical Specifications . doc <br />