Laserfiche WebLink
SECTION - 104 - EROSION CONTROL AND TREATMENT OF DEWATERING <br /> WATER AND STORMWATER FROM THE CONSTRUCTION SITE <br /> PART 1 — GENERAL <br /> 1 . 1 SCOPE <br /> A . This Section covers erosion control and the treatment of dewatering water and <br /> stormwater runoff from the construction site and work area . The pollution control <br /> measures shall prevent turbid or otherwise polluted waters from being discharged <br /> from the construction site or work area , to undeveloped portions of the site or off- <br /> site . <br /> B . The OWNER considers pollution from dewatering water and stormwater runoff from <br /> a construction site or work area to be a very serious offense . The CONTRACTOR <br /> is solely responsible for preventing pollution caused by dewatering water and <br /> stormwater runoff from the construction site or work area . <br /> C . The pollution control measures specified herein represent minimum standards to <br /> be adhered to by the CONTRACTOR throughout the Project ' s construction . The <br /> OWNER reserves the right to require the CONTRACTOR to employ additional <br /> pollution control measures , when in the sole opinion of the OWNER , they are <br /> warranted . If site specific conditions require additional erosion and stormwater <br /> pollution control measures during any phase of construction or operation to <br /> prevent erosion or to control sediment or other pollution , beyond those specified <br /> in the Drawings or herein , implement additional best management practices as <br /> necessary , in accordance with Chapter 4 , " Best Management Practices for <br /> Erosion and Sedimentation Control " of the Florida Erosion and Sediment Control q` <br /> Inspector' s Manual , <br /> http : //wwwodepostate . fl . us/water/nonpointidocs/erosion /erosion - inspectors - <br /> MEN <br /> manual . pdfand other references as may be required by regulatory permits . <br /> D . The OWNER may terminate this Contract if the CONTRACTOR fails to comply with <br /> this Section . Alternatively , the OWNER may halt the CONTRACTOR ' s operations <br /> until the CONTRACTOR is in full compliance with this Section . If the OWNER halts <br /> the CONTRACTOR ' s work as a result of its failure to comply with this Section , the <br /> Construction Contract time clock will continue to run . <br /> E . In addition to these Specifications , comply with Chapter 4 - " Best Management <br /> Practices for Erosion and Sedimentation Control " and Chapter 5 — " Best <br /> Management Practices for Dewatering " of the Florida Erosion and Sediment Control <br /> Inspector' s Manual . In the event of a conflict between the referenced Chapters and <br /> these Specifications , the more stringent requirement shall prevail . <br /> 01025-4 Technical Specifications <br /> F : \Public Works\ENGINEERING DIVISION PROJECTS\0517-OSLO ROAD_43rd Ave to 58th Ave- Phase III \Admim \bid <br /> documents\Technical Specifications . doc <br />