Ile 1 <br /> I <br /> 1 0 SOME PERMITS TO BE OBTAINED BY THE CONTRACTOR <br /> A . The OWNER has obtained certain permits for this project and they are listed in <br /> paragraph SC -6 . 08 of the Supplementary Conditions . Per paragraph SC -6 . 08 . 0 of <br /> the Supplementary Conditions , the CONTRACTOR shall apply for , obtain , and pay <br /> for all other required permits , licenses , sampling , and tests . Permits the <br /> CONTRACTOR may need to secure may include but not be limited to : <br /> 1 . Long -term and/or short-term dewatering permit as required by the St . Johns <br /> River Water Management District (SJRWMD) . Generally , only the short-term <br /> permit is required . Contact SJRWMD at ( 321 ) 9844940 to determine which <br /> permit is required and the associated statutory requirements , <br /> 2 . SJRWMD RDS -50 Permit ( required ) ; <br /> 3 . The State of Florida Generic Permit for Stormwater Discharge From Large <br /> and Small Construction Activities ( required ) . Contact the Florida <br /> Department of Environmental Protection ( FDEP ) at ( 866 ) 336-6312 (toll <br /> free ) or ( 850) 245 - 7522 or www . dep . state . fl . us/water/stormwater/npdes/ <br /> 4 . FDEP ' s Uncontaminated Groundwater Release Permit ( required if <br /> dewatering occurs) . This permit requires water quality testing by a State <br /> certified laboratory . <br /> B . Provide copies of all permits to the OWNER and ENGINEER and comply with all <br /> conditions contained in all permits at no extra cost to the OWNER . If there is a <br /> conflict between any permit requirement and these Specifications , the more <br /> stringent specification or requirement shall govern . <br /> C . In addition to paying for all permit fees , CONTRACTOR shall also pay for all water <br /> quality sampling and laboratory tests required by any permit . <br /> 1 . 3 GENERAL <br /> A . Do not begin any other construction work until the pollution control and treatment <br /> system has been constructed in accordance with approved plans and permits and <br /> approved for use by the OWNER and applicable permitting authorities . <br /> B . From time to time , the OWNER or ENGINEER will inspect the pollution control and <br /> treatment system and may take effluent samples for analysis by a testing laboratory <br /> selected and paid for by the OWNER . If at any time , the OWNER or ENGINEER <br /> determines that the pollution control and treatment system is not in compliance with <br /> the approved system , the OWNER or ENGINEER will shut the portion of the project <br /> down that is not in compliance , and it shall remain shut-down until the pollution <br /> control and treatment system is properly constructed or repaired , and complies with <br /> the approved pollution control and treatment system plans and specifications . <br /> C . Schedule construction to minimize erosion and stormwater runoff from the <br /> construction site . Implement erosion control measures on disturbed areas as soon <br /> as practicable in portions of the site where construction activities have temporarily or <br /> permanently ceased , but in no case more than 7 days after the construction activity <br /> in that portion of the site has temporarily or permanently ceased . In addition to <br /> 01025-5 Technical Specifications <br /> F \Public Works\ENGINEERING DIVISION PROJECTS\0517-OSLO ROAD_43rd Ave to 58th Ave- Phase lll \Admim\bid <br /> documents\Technical Specifications . doc <br />