My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-101A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-101A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2015 1:31:44 PM
Creation date
10/1/2015 4:28:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/22/2012
Control Number
2012-101A
Agenda Item Number
12.I.1
Entity Name
Timothy Rose Contracting
Subject
Contract Documents and Specifications
Oslo Road Phase 111 Roadway Improvements
Area
58th Avenue and 43rd Avenue
Project Number
0517
Bid Number
2012036
Supplemental fields
SmeadsoftID
11224
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B . Day ARTICLE 2 - PRELIMINARY MATTERS <br /> 1 . The word "day' shall constitute a <br /> calendar day of 24 hours measured from 2 . 01 Delivery of Bonds <br /> midnight to the next midnight . <br /> A. When CONTRACTOR delivers the executed <br /> C . Defective Agreements to OWNER, CONTRACTOR shall also <br /> deliver to OWNER such Bonds as CONTRACTOR <br /> 1 . The word "defective , " when modifying may be required to furnish , <br /> the word "Work ," refers to Work that is <br /> unsatisfactory, faulty, or deficient in that it does 2 . 02 Copies of Documents <br /> not conform to the Contract Documents or does <br /> not meet the requirements of any inspection , A. OWNER shall furnish to CONTRACTOR up <br /> reference standard , test, or approval referred to to ten copies of the Contract Documents . Additional <br /> in the Contract Documents , or has been copies will be furnished upon request at the cost of <br /> damaged prior to ENGINEER's recom . reproduction , <br /> mendation of final payment ( unless responsi- <br /> bility for the protection thereof has been 2 . 03 Commencement of Contract Times; Notice <br /> assumed by OWNER at Substantial to Proceed <br /> Completion in accordance with paragraph <br /> 14 . 04 or 14 . 05 ) . A. The Contract Times will commence to run on <br /> the thirtieth day after the Effective Date of the Agree- <br /> D . Furnish, Install, Perform, Provide ment or, if a Notice to Proceed is given , on the <br /> day <br /> indicated in the Notice to Proceed . A Notice to Pro- <br /> 1 . ceed may be given at any time within 30 days after the <br /> Effective Date of the Agreement . In no event will the <br /> Contract Times commence to run later than the <br /> . 1 . 966 , materials , OF OqUiPPRIFIRt tQ the sixtieth day after the day of Bid opening or the <br /> thirtieth <br /> day after the Effective Date of the Agreement , <br /> whichever date is earlier. <br /> 2004 Starting the Work <br /> .21 The v ,nrd 'go nstall," when „ curl in <br /> A. CONTRACTOR shall start to perform the <br /> Work on the date when the Contract Times com - <br /> mence to run . No Work shall be done at the Site prior <br /> to the date on which the Contract Times commence to <br /> 6sa run . <br /> 3 , The words 61 PeFfOPPR jP GF , 2 . 05 Before Starting Construction <br /> A . CONTRACTOR 's Review of Contract Docu- <br /> ments: Before undertaking each part of the Work , <br /> CONTRACTOR shall carefully study and compare the <br /> Contract Documents and check and verify pertinent <br /> figures therein and all applicable field measurements . <br /> 4 . When "furnish , " "install ," "perform , " or CONTRACTOR shall promptly report in writing to <br /> "provide" is not used in connection with services , ENGINEER any conflict , error, ambiguity, <br /> or <br /> materials , or equipment in a context clearly discrepancy which CONTRACTOR may discover and <br /> requiring an obligation of CONTRACTOR, shall obtain a written interpretation or clarification from <br /> "provide" is implied . ENGINEER before proceeding with any Work affected <br /> thereby; however, CONTRACTOR shall not be liable <br /> E . Unless stated otherwise in the Contract Docu- to OWNER or ENGINEER for failure to report <br /> any <br /> ments , words or phrases which have a well- known conflict , error, ambiguity, or discrepancy in the <br /> technical or construction industry or trade meaning are Contract Documents unless CONTRACTOR knew or <br /> used in the Contract Documents in accordance with reasonably should have known thereof. <br /> such recognized meaning . <br /> B . Preliminary Schedules: Within ten days after <br /> the Effective Date of the Agreement ( unless otherwise <br /> 00700 - General Conditions REV 04 -07 .doc <br /> 00700 - 8 <br /> F1Public Works\ENGINEERING DIVISION PROJECTS\0517-OSLO ROAD 43rd Ave to 58th Ave-Phase III\Admim\bid documents\00700 - General Conditions REV 04-07 <br />. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.