specified in the General Requirements ) , CONTRAC- CONTRACTOR until acceptable schedules are <br /> TOR shall submit to ENGINEER for its timely review : submitted to ENGINEER . <br /> 11 a preliminary progress schedule 1 . The progress schedule will be <br /> indicating the times ( numbers of days or dates ) acceptable to ENGINEER if it provides an <br /> for starting and completing the various stages orderly progression of the Work to completion <br /> of the Work , including any Milestones specified within any specified Milestones and the <br /> in the Contract Documents ; Contract Times . Such acceptance will not <br /> impose on ENGINEER responsibility for theIr <br /> 2 , a preliminary schedule of Shop progress schedule , for sequencing , scheduling , <br /> Drawing and Sample submittals which will list or progress of the Work nor interfere with <br /> or <br /> each required submittal and the times for sub- relieve CONTRACTOR from CONTRACTOR's <br /> mitting , reviewing , and processing such full responsibility therefor , <br /> submittal ; and <br /> 2 . CONTRACTOR's schedule of Shop <br /> 3 , a preliminary schedule of values for Drawing and Sample submittals will be <br /> all of the Work which includes quantities and acceptable to ENGINEER if it provides a <br /> prices of items which when added together workable arrangement for reviewing and <br /> equal the Contract Price and subdivides the processing the required submittals . <br /> Work into component parts in sufficient detail to <br /> serve as the basis for progress payments 3 . CONTRACTOR's schedule of values <br /> during performance of the Work . Such prices will be acceptable to ENGINEER as to form <br /> will include an appropriate amount of overhead and substance if it provides a reasonable <br /> 14 <br /> and profit applicable to each item of Work , allocation of the Contract Price to component <br /> parts of the Work . <br /> the Site is started , CONTRACTOR and OWNE all ARTICLE 3 - CONTRACT DOCUMENTS : INTENT , <br /> each deliver to the other, with copi o each AMENDING , REUSE11 <br /> additional insured identified in tupplementary <br /> Conditions , certificates of urance (and other <br /> evidence of insurance ich either of them or any 3 . 01 Intent <br /> additional insur may reasonably request) which <br /> CONTRA and OWNER respectively are A. The Contract Documents are comple- <br /> mentary; what is called for by one is as binding as if <br /> called for by all . <br /> 2 . 06 Preconstruction Conference B . It is the intent of the Contract Documents to <br /> describe a functionally complete Project (or part there- <br /> At Within 20 days after the G. A. Atrant 11IMP 's stg?l of) to be constructed in accordance with the <br /> Contract <br /> to run , but before any Work at the Site i arted , a Documents . Any labor , documentation , services , <br /> conference attended by CONTRACT ENGINEER, materials , or equipment that may reasonably be <br /> and others as appropriate wil held to establish a inferred from the Contract Documents or from <br /> working <br /> prevailing custom or trade usage as being required to <br /> Work and to disc a schedules referred to in para- produce the intended result will be provided whether <br /> graph 2 . 05 , rocedures for handling Shop Drawings or not specifically called for at no additional cost <br /> to <br /> and er submittals , processing Applications for OWNER . <br /> C . Clarifications and interpretations of the <br /> 2 . 07 Initial Acceptance of Schedules Contract Documents shall be issued by ENGINEER <br /> as provided in Article 9 . <br /> A. Unless otherwise provided in the Contract <br /> Documents , at least ten days before submission of the 3 . 02 Reference Standards <br /> first Application for Payment a conference attended by <br /> CONTRACTOR, ENGINEER, and others as appropri- A . Standards, Specifications, Codes, Laws, and <br /> ate will be held to review for acceptability to ENGI - Regulations <br /> NEER as provided below the schedules submitted in <br /> accordance with paragraph 2 . 05 . B . CONTRACTOR 1 . Reference to standards , specifica- <br /> shall have an additional ten days to make corrections tions , manuals , or codes of any technical <br /> and adjustments and to complete and resubmit the society, organization , or association , or to Laws <br /> schedules . No progress payment shall be made to or Regulations , whether such reference be <br /> 00700 - General Conditions REV 04 -07 <br /> 00700 - 9 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\0517-OSLO ROAD_ 43rd Ave to 58th Ave-Phase III\Admim\bid documents\00700 - General Conditions REV 04-07 . <br />doc <br /> x <br /> x <br /> } <br />