My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-101A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-101A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2015 1:31:44 PM
Creation date
10/1/2015 4:28:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/22/2012
Control Number
2012-101A
Agenda Item Number
12.I.1
Entity Name
Timothy Rose Contracting
Subject
Contract Documents and Specifications
Oslo Road Phase 111 Roadway Improvements
Area
58th Avenue and 43rd Avenue
Project Number
0517
Bid Number
2012036
Supplemental fields
SmeadsoftID
11224
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
specified in the General Requirements ) , CONTRAC- CONTRACTOR until acceptable schedules are <br /> TOR shall submit to ENGINEER for its timely review : submitted to ENGINEER . <br /> 11 a preliminary progress schedule 1 . The progress schedule will be <br /> indicating the times ( numbers of days or dates ) acceptable to ENGINEER if it provides an <br /> for starting and completing the various stages orderly progression of the Work to completion <br /> of the Work , including any Milestones specified within any specified Milestones and the <br /> in the Contract Documents ; Contract Times . Such acceptance will not <br /> impose on ENGINEER responsibility for theIr <br /> 2 , a preliminary schedule of Shop progress schedule , for sequencing , scheduling , <br /> Drawing and Sample submittals which will list or progress of the Work nor interfere with <br /> or <br /> each required submittal and the times for sub- relieve CONTRACTOR from CONTRACTOR's <br /> mitting , reviewing , and processing such full responsibility therefor , <br /> submittal ; and <br /> 2 . CONTRACTOR's schedule of Shop <br /> 3 , a preliminary schedule of values for Drawing and Sample submittals will be <br /> all of the Work which includes quantities and acceptable to ENGINEER if it provides a <br /> prices of items which when added together workable arrangement for reviewing and <br /> equal the Contract Price and subdivides the processing the required submittals . <br /> Work into component parts in sufficient detail to <br /> serve as the basis for progress payments 3 . CONTRACTOR's schedule of values <br /> during performance of the Work . Such prices will be acceptable to ENGINEER as to form <br /> will include an appropriate amount of overhead and substance if it provides a reasonable <br /> 14 <br /> and profit applicable to each item of Work , allocation of the Contract Price to component <br /> parts of the Work . <br /> the Site is started , CONTRACTOR and OWNE all ARTICLE 3 - CONTRACT DOCUMENTS : INTENT , <br /> each deliver to the other, with copi o each AMENDING , REUSE11 <br /> additional insured identified in tupplementary <br /> Conditions , certificates of urance (and other <br /> evidence of insurance ich either of them or any 3 . 01 Intent <br /> additional insur may reasonably request) which <br /> CONTRA and OWNER respectively are A. The Contract Documents are comple- <br /> mentary; what is called for by one is as binding as if <br /> called for by all . <br /> 2 . 06 Preconstruction Conference B . It is the intent of the Contract Documents to <br /> describe a functionally complete Project (or part there- <br /> At Within 20 days after the G. A. Atrant 11IMP 's stg?l of) to be constructed in accordance with the <br /> Contract <br /> to run , but before any Work at the Site i arted , a Documents . Any labor , documentation , services , <br /> conference attended by CONTRACT ENGINEER, materials , or equipment that may reasonably be <br /> and others as appropriate wil held to establish a inferred from the Contract Documents or from <br /> working <br /> prevailing custom or trade usage as being required to <br /> Work and to disc a schedules referred to in para- produce the intended result will be provided whether <br /> graph 2 . 05 , rocedures for handling Shop Drawings or not specifically called for at no additional cost <br /> to <br /> and er submittals , processing Applications for OWNER . <br /> C . Clarifications and interpretations of the <br /> 2 . 07 Initial Acceptance of Schedules Contract Documents shall be issued by ENGINEER <br /> as provided in Article 9 . <br /> A. Unless otherwise provided in the Contract <br /> Documents , at least ten days before submission of the 3 . 02 Reference Standards <br /> first Application for Payment a conference attended by <br /> CONTRACTOR, ENGINEER, and others as appropri- A . Standards, Specifications, Codes, Laws, and <br /> ate will be held to review for acceptability to ENGI - Regulations <br /> NEER as provided below the schedules submitted in <br /> accordance with paragraph 2 . 05 . B . CONTRACTOR 1 . Reference to standards , specifica- <br /> shall have an additional ten days to make corrections tions , manuals , or codes of any technical <br /> and adjustments and to complete and resubmit the society, organization , or association , or to Laws <br /> schedules . No progress payment shall be made to or Regulations , whether such reference be <br /> 00700 - General Conditions REV 04 -07 <br /> 00700 - 9 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\0517-OSLO ROAD_ 43rd Ave to 58th Ave-Phase III\Admim\bid documents\00700 - General Conditions REV 04-07 . <br />doc <br /> x <br /> x <br /> } <br />
The URL can be used to link to this page
Your browser does not support the video tag.