Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders
<br /> with respect to a Hazardous Environmental Condition at the Site , if any, and possible changes in
<br /> the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at
<br /> the Site which was not shown or indicated in the Drawings or Specifications or identified in the
<br /> Contract Documents to be within the scope of the Work appear in paragraph 4 . 06 of the General
<br /> Conditions .
<br /> 4. 05 Upon a request directed to the ENGINEER (Michael D . Nixon , P. E . 772-226= 1986) ,
<br /> OWNER will provide Bidder access to the Site to conduct such examinations, investigations ,
<br /> explorations , tests , and studies as Bidder deems necessary for submission of a Bid . Bidder shall
<br /> fill all holes and clean up and restore the Site to its former condition upon completion of
<br />such
<br /> explorations , investigations, tests, and studies .
<br /> 4 . 06 This paragraph has been deleted intentionally
<br /> 4 . 07 It is the responsibility of each Bidder before submitting a Bid to :
<br /> A. examine and carefully study the Bidding Documents , including any Addenda and the other
<br /> related data identified in the Bidding Documents ;
<br /> B. VISIT THE SITE AFTER CONTACTING THE ENGINEER ( MICHAEL D. NIXON , P. E. ,
<br /> (772) 2264986) TO MAKE ARRANGEMENTS IN ADVANCE, AND BECOME FAMILIAR WITH
<br /> AND SATISFY BIDDER AS TO THE GENERAL, LOCAL, AND SITE CONDITIONS THAT MAY
<br /> AFFECT COST, PROGRESS , AND PERFORMANCE OF THE WORK,
<br /> C . become familiar with and satisfy Bidder as to all federal , state , and local Laws and
<br /> Regulations that may affect cost , progress , or performance of the Work;
<br /> D . carefully study all reports of explorations and tests of subsurface conditions at or
<br /> contiguous to the Site and all drawings of physical conditions in or relating to existing surface or
<br /> subsurface structures at or contiguous to the Site (except Underground Facilities) which have
<br /> been . .identified in the Supplementary Conditions as provided in paragraph 4. 02 of the General
<br /> Conditions , and carefully study all reports and drawings of a Hazardous Environmental Condition ,
<br /> if any, at the Site which have been identified in the Supplementary Conditions as provided in
<br /> paragraph 4. 06 of the General Conditions ;
<br /> E . obtain and carefully study (or assume responsibility for doing so) all additional or
<br /> supplementary examinations , investigations , explorations , tests , studies, and data concerning
<br /> conditions (overhead , surface , subsurface, and Underground Facilities) at or contiguous to the
<br /> Site which may affect cost, progress , or performance of the Work or which relate to any aspect of
<br /> the means , methods , techniques , sequences , and procedures of construction to be employed by
<br /> Bidder, including any specific means , methods, techniques , sequences , and procedures of
<br /> construction expressly required by the Bidding Documents, and safety precautions and programs
<br /> incident thereto ;
<br /> F. agree at the time of submitting its Bid that no further examinations , investigations ,
<br /> explorations , tests , studies , or data are necessary for the determination of its Bid for performance
<br /> of the Work at the price bid and within the times and in accordance with the other terms
<br /> and
<br /> conditions of the Bidding Documents ;
<br /> G . become aware of the general nature of the work to be performed by OWNER . and others
<br /> at the Site that relates to the Work as indicated in the Bidding Documents ;
<br /> 00200 = Instructions to Bidders FOR LAP PROJECTS ONLY REV 08A0.doc
<br /> 00200 = 3
<br /> F:\Public Works\ENGINEERING DIVISION PROJECTS11102-01d Dixie Hwy Swk 8th St to SR 60-LAPWdmim\bid documentsX AP Documents\00200 - Instructions to Bidders
<br /> FOR LAP PROJECTS ONLY REV 08-10.doc Rev. 05/01