My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-204A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-204A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:24:25 AM
Creation date
10/1/2015 4:48:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2012
Control Number
2012-204A
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents Specifications
Federal Aid Project FM #425710-1-28-01
Area
Old Dixie Highway 8th St. to SR 60
Project Number
1102
Supplemental fields
SmeadsoftID
11622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H . correlate the information known to Bidder, information and observations obtained from <br /> visits to the Site , reports and drawings identified in the Bidding Documents , and all additional <br /> examinations , investigations , explorations , tests , studies , and data with the Bidding Documents ; <br /> L promptly give ENGINEER written notice of all conflicts , errors , ambiguities , or <br /> discrepancies that Bidder discovers in the Bidding Documents and confirm that the written <br /> resolution thereof by ENGINEER is acceptable to Bidder; and <br /> J . determine that the Bidding Documents are generally sufficient to indicate and convey <br /> understanding of all terms and conditions for the performance of the Work. <br /> 4 . 08 The submission of a Bid will constitute an incontrovertible representation by Bidder that <br /> Bidder has complied with every requirement of this Article 4, that without exception the Bid is <br /> premised upon performing and furnishing the Work required by the Bidding Documents and <br /> applying any specific means , methods , techniques , sequences, and procedures of construction <br /> that may be shown or indicated or expressly required by the Bidding Documents , that Bidder has <br /> given ENGINEER written notice of all conflicts , errors , ambiguities , and discrepancies that Bidder <br /> has discovered in the Bidding Documents and the written resolutions thereof by ENGINEER are <br /> acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and <br /> convey understanding of all terms and conditions for performing and furnishing the Work. <br /> ARTICLE 5 - PRE-BID CONFERENCE <br /> 5. 01 The date , time, and location for a MANDATORY Pre-Bid conference , are specified in <br /> the Advertisement for Bids . Representatives of OWNER and ENGINEER will be present to <br /> discuss the Project . Bidders are REQUIRED to attend and participate in the conference . <br /> ENGINEER will transmit to all prospective Bidders of record such Addenda as ENGINEER <br /> considers necessary in response to questions arising at the conference . Oral statements may not <br /> be relied upon and will not be binding or legally effective. <br /> ARTICLE 6 - SITE AND OTHER AREAS <br /> 6 . 01 The Site is identified in the Bidding Documents . All additional lands and access <br /> thereto required for temporary construction facilities , construction equipment, or storage of <br /> materials and equipment to be incorporated in the Work are to be obtained and paid for <br /> by <br /> CONTRACTOR. Easements for permanent structures or permanent changes in existing facilities <br /> are to be obtained and paid for by OWNER unless otherwise provided in the Bidding Documents . <br /> ARTICLE 7 - INTERPRETATIONS AND ADDENDA <br /> 7 . 01 All questions about the meaning or intent of the Bidding Documents are to be <br /> submitted to purchasing4lircgov. com in writing . I Interpretations or clarifications considered <br /> necessary by ENGINEER in response to such questions will be issued by Addenda mailed or <br /> delivered to all parties through the Issuing Office as having received the Bidding Documents . <br /> Questions received less than ten days prior to the date for opening of Bids may not be answered . <br /> Only questions answered by Addenda will be binding . Oral and other interpretations or <br /> clarifications will be without legal effect . <br /> 00200 - Instructions to Bidders FOR LAP PROJECTS ONLY REV 08- 10.doc <br /> 00200 = 4 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS11102-01d Dixie Hwy Swk 8th St to SR 60•LAP%dmim\bid documents\LAP Documents\00200 - Instructions to Bidders <br /> FOR LAP PROJECTS ONLY REV 08A0.doc Rev. 05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.