My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-204A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-204A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:24:25 AM
Creation date
10/1/2015 4:48:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2012
Control Number
2012-204A
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents Specifications
Federal Aid Project FM #425710-1-28-01
Area
Old Dixie Highway 8th St. to SR 60
Project Number
1102
Supplemental fields
SmeadsoftID
11622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Documents, by a mutually agreed lump sum <br /> (which may include an allowance for overhead f. when both additions and credits are <br /> and profit not necessarily in accordance with involved in any one change, the adjustment <br /> paragraph 12 . 01 . C . 2) ; or in CONTRACTOR's fee shall be computed <br /> on the basis of the net change in <br /> 30 where the Work involved is not cov- accordance with paragraphs 12 . 01 . C. 2 . a <br /> ered by unit prices contained in the Contract through 12. 01 . C. 2 . e , inclusive. <br /> Documents and agreement to a lump sum is <br /> not reached under paragraph 12 . 01 . 13 . 2 , on the 12 . 02 Change of Contract Times <br /> basis of the Cost of the Work (determined as <br /> provided in paragraph 11 . 01 ) plus a A. The Contract Times ( or Milestones) may only <br /> CONTRACTOR's fee for overhead and profit be changed by a Change Order or by a Written <br /> (determined as provided in paragraph 12 . 01 . C) . Amendment. Any Claim for an adjustment in the <br /> Contract Times (or Milestones) shall be based on <br /> C. CONTRACTOR's Fee: The written notice submitted by the party making the claim <br /> CONTRACTOR's fee for overhead and profit shall be to the ENGINEER and the other party to the Contract <br /> determined as follows: in accordance with the provisions of paragraph 10. 05. <br /> 1 . a mutually acceptable fixed fee; or B. Any adjustment of the Contract Times (or <br /> Milestones) covered by a Change Order or of any <br /> 20 if a fixed fee is not agreed upon , then Claim for an adjustment in the Contract Times <br /> (or <br /> a fee based on the following percentages of the Milestones) will be determined in accordance with the <br /> various portions of the Cost of the Work: provisions of this Article 12 . <br /> a. for costs incurred under para- 12 . 03 Delays Beyond CONTRACTOR's Control <br /> graphs 11001OA01 and 11001 .A.2 , the <br /> CONTRACTOR's fee shall be 15 percent; A. Where CONTRACTOR is prevented from <br /> completing any part of the Work within the Contract <br /> b. for costs incurred under paragraph Times (or Milestones) due to delay beyond the control <br /> 11 . 01 .A. 3 , the CONTRACTOR's fee shall of CONTRACTOR , the Contract Times (or <br /> be five percent; Milestones) will be extended in an amount equal to the <br /> time lost due to such delay if a Claim is made therefor <br /> co where one or more tiers of subcon- as provided in paragraph 12 . 02 .A. Delays beyond the <br /> tracts are on the basis of Cost of the Work control of CONTRACTOR shall include, but not be <br /> plus a fee and no fixed fee is agreed upon , limited to, acts or neglect by OWNER, acts or neglect <br /> the intent of paragraph 12 . 01 . C.2 . a is that of utility owners or other contractors performing other <br /> the Subcontractor who actually performs work as contemplated by Article 7 , fires, floods, <br /> the Work, at whatever tier, will be paid a fee epidemics, abnormal weather conditions, or acts of <br /> of 15 percent of the costs incurred by such God . <br /> Subcontractor under paragraphs 11 . 01 .A. 1 <br /> and 11 . 01 .A. 2 and that any higher tier 12 . 04 Delays Within CONTRACTOR's Control <br /> Subcontractor and CONTRACTOR will <br /> each be paid a fee of five percent of the A. The Contract Times (or Milestones) will not be <br /> amount paid to the next lower tier Subcon- extended due to delays within the control of <br /> tractor, CONTRACTOR . Delays attributable to and within the <br /> control of a Subcontractor or Supplier shall be <br /> do no fee shall be payable on the deemed to be delays within the control of CONTRAC- <br /> basis of costs itemized under paragraphs TOR. <br /> 11001 .A.4 , 11 . 01 .A. 5, and 11 . 01 . 13 ; <br /> 12 . 05 Delays Beyond OWNER's and <br /> e. the amount of credit to be allowed CONTRACTOR's Control <br /> by CONTRACTOR to OWNER for any <br /> change which results in a net decrease in A. Where CONTRACTOR is prevented from <br /> cost will be the amount of the actual net completing any part of the Work within the Contract <br /> decrease in cost plus a deduction in Times (or Milestones) due to delay beyond the control <br /> CONTRACTOR's fee by an amount equal of both OWNER and CONTRACTOR, an extension of <br /> to five percent of such net decrease ; and the Contract Times (or Milestones) in an amount <br /> 00700 - General Conditions REV 04-07.doc <br /> 00700 - 35 <br /> F:1Public Works%ENGINEERING DIVISION PROJECTS11102-Old Dixie Hwy Swk 6th St to SR 60-LAPWdmimtbid documents\Master Contract Documents100700 - General Conditions <br /> REV <br /> 04-07. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.