Laserfiche WebLink
equal to the time lost. due to such delay shall be <br /> CONTRACTOR's sole and exclusive remedy for such 13 . 03 Tests and Inspections <br /> delay. <br /> A. CONTRACTOR shall give ENGINEER timely <br /> 12 . 06 Delay Damages notice of readiness of the Work for all required <br /> inspections, tests , or approvals and shall cooperate <br /> A. In no event shall OWNER or ENGINEER be with inspection and testing personnel to facilitate <br /> liable to CONTRACTOR, any Subcontractor, any required inspections or tests. <br /> Supplier, or any other person or organization , or to any <br /> surety for or employee or agent of any of them , for Be OWNER shall empley and pay f49F tW <br /> damages arising out of or resulting from : <br /> pefti:m all inspeGtiens , tests, OF approvals FequiFed by <br /> 1 . delays caused by or within the control <br /> of CONTRACTOR ; or <br /> 20 delays beyond the control of both GoveFed by paFagFaphs 113. 034 and 130035D <br /> OWNER and CONTRACTOR including but not below; <br /> limited to fires, floods, epidemics, abnormal <br /> weather conditions, acts of God , or acts or <br /> neglect by utility owners or other contractors <br /> performing other work as contemplated by paFagraph 43 . 04 , 13 shall be paid as pmvidedin <br /> Article 7. said paFagFaph 13 . 04 . 0; aPA <br /> Be Nothing in this paragraph 12 . 06 bars a 30 as Gthepwise speGifiGally provide <br /> °change in Contract Price pursuant to this Article 12 to <br /> compensate CONTRACTOR due to delay, <br /> interference, or disruption directly attributable to C. If Laws or Regulations of any public body <br /> actions or inactions of OWNER or anyone for whom having jurisdiction require any Work (or part thereof) <br /> OWNER is responsible. specifically to be inspected , tested , or approved by an <br /> employee or other representative of such public body , <br /> CONTRACTOR shall assume full responsibility for <br /> ARTICLE 13 emsTESTS AND INSPECTIONS; arranging and obtaining such inspections, tests, or <br /> CORRECTION , REMOVAL OR ACCEPTANCE OF approvals, pay all costs in connection therewith , and <br /> DEFECTIVE WORK furnish ENGINEER the required certificates of inspec- <br /> tion or approval. <br /> 13 . 01 Notice of Defects D . CONTRACTOR shall be responsible for <br /> arranging and obtaining and shall pay all costs in <br /> A. Prompt notice of all defective Work of which connection with any inspections, tests, or approvals <br /> OWNER or ENGINEER has actual knowledge will be required for OWNER 's and ENGINEER's acceptance <br /> given to CONTRACTOR. All defective Work may be of materials or equipment to be incorporated in the <br /> rejected , corrected , or accepted as provided in this Work; or acceptance of materials, mix designs, <br /> or <br /> Article 13. equipment submitted for approval prior to <br /> CONTRACTOR's purchase thereof for incorporation <br /> 13 . 02 Access to Work in the Work. Such inspections, tests, or approvals <br /> shall be performed by organizations acceptable to <br /> A. OWNER, ENGINEER , ENGINEER's Con- OWNER and ENGINEER . <br /> sultants, other representatives and personnel of <br /> OWNER , independent testing laboratories, and E . If any Work (or the work of others) that is to <br /> governmental agencies with jurisdictional interests will be inspected , tested , or approved is covered by CON- <br /> have access to the Site and the Work at reasonable TRACTOR without written concurrence of ENGI - <br /> times for their observation , inspecting , and testing . NEER, it must, if requested by ENGINEER , be uncov- <br /> CONTRACTOR shall provide them proper and safe ered for observation . <br /> conditions for such access and advise them of <br /> CONTRACTOR's Site safety procedures and F. Uncovering Work as provided in paragraph <br /> programs so that they may comply therewith as 13. 03. E shall be at CONTRACTOR's expense unless <br /> applicable. CONTRACTOR has given ENGINEER timely notice <br /> 00700 - General Conditions REV 0447.dgc <br /> 00700 - 36 <br /> PIPublic Works\ENGINEERING DIVISION PROJECTS11102.01d Dixie Hwy Swk 6th St to SR 60-LAPWdmim\bid documentsWaster Contract DocumentM00700 - General Conditions <br /> REV <br /> 04-07 .doc <br />