My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-204A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-204A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:24:25 AM
Creation date
10/1/2015 4:48:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2012
Control Number
2012-204A
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents Specifications
Federal Aid Project FM #425710-1-28-01
Area
Old Dixie Highway 8th St. to SR 60
Project Number
1102
Supplemental fields
SmeadsoftID
11622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
parties that might entitle CONTRACTOR to be 11 TAM days afteF pFesentation of <br /> paid additionally by OWNER or entitle OWNER <br /> to withhold payment to CONTRACTOR . , the amewn <br /> 4. Neither ENGINEER Is review of , and when <br /> CONTRACTOR's Work for the purposes of due well be paid by OWNER to GONTRACTOR <br /> recommending payments nor ENGINEER's <br /> recommendation of any payment, including final D. Reduction in Payment <br /> payment, will impose responsibility on <br /> ENGINEER to supervise, direct, or control the 1 . OWNER may refuse to make <br /> Work or for the means, methods, techniques, payment of the full amount recommended by <br /> sequences, or procedures of construction , or ENGINEER because: <br /> the safety precautions and programs incident <br /> thereto, or for CONTRACTOR's failure to a . claims have been made against <br /> comply with Laws and Regulations applicable to OWNER on account of CONTRACTOR's <br /> CONTRACTOR's performance of the Work. performance or furnishing of the Work; <br /> Additionally, said review or recommendation will <br /> not impose responsibility on ENGINEER to b. Liens have been filed in connection <br /> make any examination to ascertain how or for with the Work, except where <br /> what purposes CONTRACTOR has used the CONTRACTOR has delivered a specific <br /> moneys paid on account of the Contract Price, Bond satisfactory to OWNER to secure the <br /> or to determine that title to any of the Work, satisfaction and discharge of such Liens; <br /> materials, or equipment has passed to <br /> OWNER free and clear of any Liens. c. there are other items entitling OWN- <br /> ER to a set-off against the amount <br /> 5. ENGINEER may refuse to recom- recommended ; or <br /> mend the whole or any part of any payment if, <br /> in ENGINEER's opinion , it would be incorrect to d . OWNER has actual knowledge of the <br /> make the representations to OWNER referred occurrence of any of the events enumerated <br /> to in paragraph 14. 02 . 13. 2 . ENGINEER may in paragraphs 14 . 02 . B . 5 . a through <br /> also refuse to recommend any such payment 14. 02 . B . 5 . c or paragraph 15 . 02 .A. <br /> or, because of subsequently discovered <br /> evidence or the results of subsequent 2 . If OWNER refuses to make payment <br /> inspections or tests, revise or revoke any such of the full amount recommended by <br /> payment recommendation previously made, to ENGINEER, OWNER must give <br /> such extent as may be necessary in CONTRACTOR immediate written notice (with <br /> ENGINEER's opinion to protect OWNER from a copy to ENGINEER) stating the reasons for <br /> loss because: such action and promptly pay CONTRACTOR <br /> any amount remaining after deduction of the <br /> a. the Work is defective, or completed amount so withheld . OWNER shall promptly <br /> Work has been damaged , requiring pay CONTRACTOR the amount so withheld, or <br /> correction or replacement; any adjustment thereto agreed to by OWNER <br /> and CONTRACTOR, when CONTRACTOR <br /> b. the Contract Price has been reduced corrects to OWNER's satisfaction the reasons <br /> by Written Amendment or Change Orders; for such action . <br /> c. OWNER has been required to correct 3 . If it is subsequently determined that <br /> defective Work or complete Work in accor- OWNER's refusal of payment was not justified , <br /> dance with paragraph 13. 09 ; or the amount wrongfully withheld shall be treated <br /> as an amount due as determined by paragraph <br /> 14 . 02 . C. 10 <br /> ;UFFeRG8 of any of the events enuFneF- <br /> . 14. 03 CONTRACTOR's Warranty of Title <br /> C. Payment Becomes Due A. CONTRACTOR warrants and guarantees <br /> that title to all Work, materials, and equipment covered <br /> by any Application for Payment, whether incorporated <br /> 00700 - General Conditions REV 04-07. doe <br /> 00700 - 40 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1102.Old Dixie Hwy Swk 8th St to SR 60=LAPWdmimlbid documents\Master Contract Documents\00700 - General Conditions <br /> REV <br /> 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.