My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-204A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-204A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:24:25 AM
Creation date
10/1/2015 4:48:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2012
Control Number
2012-204A
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents Specifications
Federal Aid Project FM #425710-1-28-01
Area
Old Dixie Highway 8th St. to SR 60
Project Number
1102
Supplemental fields
SmeadsoftID
11622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in the Project or not, will pass to OWNER no later than B. OWNER shall have the right to exclude <br /> the time of payment free and clear of all Liens. CONTRACTOR from the Site after the date of <br /> Substantial Completion , but OWNER shall allow CON- <br /> 14 . 04 Substantial Completion TRACTOR reasonable access to complete or correct <br /> items on the tentative list. <br /> A. When CONTRACTOR considers the entire <br /> Work ready for its intended use CONTRACTOR shall 14 .05 Partial Utilization <br /> notify OWNER and ENGINEER in writing that the <br /> entire Work is substantially complete (except for items A. Use by OWNER at OWNER's option of any <br /> specifically listed by CONTRACTOR as incomplete) substantially completed part of the Work which has <br /> and request that ENGINEER issue a certificate of specifically been identified in the - Contract Documents, <br /> Substantial Completion . Promptly thereafter, or which OWNER , ENGINEER, and CONTRACTOR <br /> OWNER , CONTRACTOR, and ENGINEER shall agree constitutes a separately functioning and usable <br /> make an inspection of the Work to determine the part of the Work that can be used by OWNER <br /> for its <br /> status of completion . If ENGINEER does not consider intended purpose without significant interference with <br /> the Work substantially complete, ENGINEER will CONTRACTOR's performance of the remainder of <br /> notify CONTRACTOR in writing giving the reasons the Work, may be accomplished prior to Substantial <br /> therefore. Completion of all the Work subject to the following <br /> substantially � & I � MMEF.R will pFepaFe and conditions. <br /> GGmpletien whiGh shall fix the date of 81 lbetantial 1 . OWNER at any time may request <br /> CONTRACTOR in writing to permit OWNER to <br /> a tentative list of items to be GOMpleted OF GOFmGted use. any such part of the Work which OWNER <br /> befem final payment. QWN9R shall have seven days. believes to be ready for its intended use and <br /> substantially complete. If CONTRACTOR <br /> maka 111119MAR ObjeGtion to ENGINEER as to any agrees that such part of the Work is <br /> lost. afteF substantially complete, CONTRACTOR will <br /> certify to OWNER and ENGINEER that such <br /> that thA Wgi:k 06 not substantially , part of the Work is substantially complete and <br /> ENG. INEMER will within 14 days afteF SUbMiAlSiGA af thA request ENGINEER to issue a certificate of <br /> Substantial Completion for that part of the <br /> Work. CONTRACTOR at any time may notify <br /> *dAr;at*nR of cans ' OWNER and ENGINEER in writing that <br /> nnngodgrs the WeFk substantially , CONTRACTOR considers any such part of the <br /> 9NGINEER will within said 14 days exeGute and Work ready for its intended use and substan- <br /> deliver to CMAfNER and GONTRAGTOR a definitive tially complete and request ENGINEER to issue <br /> GeFtifiGate of Substantial Gompletion (with a revised a certificate of Substantial Completion for that <br /> part of the Work. Within a reasonable time <br /> after either such request, OWNER, <br /> as ENGINEER believes justified afteF GGAR.W. A. rat4I nO CONTRACTOR , and ENGINEER shall make <br /> an inspection of that part of the Work to <br /> of the tentative GeFtifiGate of Substantial Gempletion determine its status of completion . If <br /> ENGINEER will del 9 YeF t49 OWNER and GONTRAG ENGINEER does not consider that part of the <br /> Work to be substantially complete, ENGINEER <br /> will notify OWNER and CONTRACTOR in <br /> OWNER and GONTRAGTOR with FespeGt to seGU *; writing giving the reasons therefor. If <br /> , ENGINEER considers that part of the Work to <br /> utilities,maonteitianGe , heat, ' be substantially complete, the provisions of <br /> paragraph 14 .04 will apply with respect to <br /> certification of Substantial Completion of that <br /> inFnrm ENGINEER in writing nrinr •n ENGINEER's part of the Work and the division of <br /> ng the definitive n�ertifi"� CIA 6 � w� responsibility in respect thereof and access <br /> F=NGINr.= r.= R 's afera. said FeGGMAendatuen will be thereto. <br /> payment*bunding en OWNER and GONTPAGTOR uRtil final <br /> 2 . No occupancy or separate operation <br /> of part of the Work may occur prior to <br /> 00700 - General Conditions REV 0447.doo <br /> 00700 - 41 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS11102-Old Dixie Hwy Swk 8th St to SR 60-LAPWdmim\bid documents\Master Contract Documents\00700 - General Conditions <br /> REV <br /> 04-07.doc <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.