My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-204A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-204A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:24:25 AM
Creation date
10/1/2015 4:48:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2012
Control Number
2012-204A
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents Specifications
Federal Aid Project FM #425710-1-28-01
Area
Old Dixie Highway 8th St. to SR 60
Project Number
1102
Supplemental fields
SmeadsoftID
11622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . Payment shall be made by OWNER to CONTRACTOR according to the Local <br /> Government Prompt Payment Act, F . S . 218 . 70 et. seq . <br /> SC- 14 . 04A. After the third sentence in paragraph GC- 14. 04A of the General Conditions, <br /> delete the remainder of paragraph 14. 04A in its entirety and replace with the following: <br /> " If Engineer considers the Work substantially complete , Engineer will prepare <br /> and deliver to Owner a tentative certificate of Substantial Completion that shall fix <br /> the date of Substantial Completion . In accordance with the provisions of Florida <br /> Statutes section 208 . 735(7) (a) (2005) , upon receipt of the tentative certificate of <br /> Substantial Completion from Engineer, the Owner, the Engineer, and the <br /> Contractor shall conduct a walk-through inspection of the Project to document a <br /> list of any items required to render the Work on the . Project complete , <br /> satisfactory , and acceptable under this Agreement ( herein the "Statutory List") . <br /> The Statutory List shall be reduced to writing and circulated among the Owner, <br /> the Engineer, and the Contractor by the Owner or the Engineer within 30 <br /> calendar days after substantial completion . The Owner and Contractor <br /> acknowledge and agree that: 1 ) the failure to include any corrective work , or <br /> pending items that are not yet completed , on the Statutory List does not alter the <br /> responsibility of the Contractor to complete all of the Work under this Agreement; <br /> 2) upon completion of all items on the Statutory List, the Contractor may submit a <br /> pay request for all remaining retainage except as otherwise set forth in this <br /> Agreement ; and 3) any and all items that require correction under this Agreement <br /> and that are identified after the preparation of the Statutory List remain the <br /> obligation of the Contractor to complete to the Owner's satisfaction under this <br /> Agreement. After receipt of the Statutory List by the Contractor, the Contractor <br /> acknowledges and agrees that it will diligently proceed to complete all items on <br /> the Statutory List and schedule a final walk-through in anticipation of final <br /> completion on the Project . " <br /> SC- l4 . 04B Add the following new paragraph immediately after paragraph GC 14. 048: <br /> Co At the time of delivery of the tentative certificate of Substantial Completion , Engineer will <br /> deliver to Owner and Contractor a written recommendation as to division of responsibilities <br /> pending final payment between Owner and Contractor with respect to security, operation , <br /> safety, and protection of the Work, maintenance , heat , utilities , insurance , and warranties and <br /> guarantees <br /> SC-14. 07 Final Payment <br /> SC= 14. 07 . C . 1 . Delete paragraph GG14. 07. C. 1 in its entirety and insert the following <br /> paragraph in its place: <br /> Co Payment Becomes Due <br /> 1 . Payment shall be made by OWNER to CONTRACTOR according to the " Local <br /> Government Prompt Payment Act" , Florida Statutes section 218. 70, et. seq . <br /> SC-15. 01 OWNER May Suspend Work <br /> SC- 15 . 01 .A Delete the last sentence in paragraph GG15. 01 .A and insert the following in its <br /> place: <br /> 00800-8 <br /> 00800 - Supplementary Conditions 06=09 rev.doc <br /> 00800 8FAPublic Works\ENGINEERING DIVISION PROJECTS\1102-Old Dixie Hwy Swk 8th St to SR 60-LAPWdmim\bid documents\Master Contract Documents\00800 - <br /> Supplementary Conditions 06-09 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.