My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-204A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-204A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:24:25 AM
Creation date
10/1/2015 4:48:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2012
Control Number
2012-204A
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents Specifications
Federal Aid Project FM #425710-1-28-01
Area
Old Dixie Highway 8th St. to SR 60
Project Number
1102
Supplemental fields
SmeadsoftID
11622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br /> PROTECTION OF THE WORK AND PROPERTY <br /> 1 . 6 DAMAGE TO EXISTING STRUCTURES AND UTILITIES <br /> A . The CONTRACTOR shall be responsible for and make good all damage to <br /> pavement beyond the limits of this Contract, buildings , telephone or other <br /> cables , water pipes , sanitary pipes , or other structures which may e <br /> encountered , whether or not shown on the Drawings . <br /> Be Information shown on the Drawings as to the location of existing utilities has <br /> been prepared from the most reliable data available to the Engineer. This <br /> information is not guaranteed , however, and it shall be this CONTRACTOR's <br /> responsibility to determine the location, character and depth of any existing <br /> utilities . He shall assist the utility companies , by every means possible to <br /> determine said locations . Extreme caution shall be exercised to eliminate any <br /> possibility of any damage to utilities resulting from his activities . <br /> 1 . 7 ADJUSTMENTS OF UTILITY CASTINGS COVERS AND BOXES <br /> A. All existing utility castings , including valve boxes , junction boxes , manholes , pull <br /> boxes , inlets and similar structures in the areas of construction that are to <br /> remain in service shall be adjusted by the CONTRACTOR to bring them flush <br /> with the surface of the finished work . <br /> Be The CONTRACTOR shall coordinate the utilities to ensure proper construction <br /> sequencing . CONTRACTOR shall make available survey reference markers to <br /> the various utility companies . <br /> + + END OF SECTION + + <br /> 01541 -5 FAPublic Works\ENGINEERING DIVISION <br /> PROJECTS\1102-Old Dixie Hwy Swk 8th St to SR 60-LAP\Admim\bid documents\Master Contract <br /> Documents\01541 - Protection of Property. doc <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.