My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-204A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-204A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:24:25 AM
Creation date
10/1/2015 4:48:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2012
Control Number
2012-204A
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents Specifications
Federal Aid Project FM #425710-1-28-01
Area
Old Dixie Highway 8th St. to SR 60
Project Number
1102
Supplemental fields
SmeadsoftID
11622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01550 <br /> ACCESS ROADS , PARKING AREAS <br /> AND USE OF PUBLIC STREETS <br /> 1 . 1 GENERAL <br /> A. Provide all temporary construction roads , walks and parking areas required <br /> during construction and for use of emergency vehicles . Design and maintain <br /> temporary roads and parking areas so they are fully usable in all weather <br /> conditions . <br /> B . Prevent interference with traffic and the OWNER's operations on existing roads . <br /> Indemnify and save harmless the OWNER from any expenses caused by <br /> CONTRACTOR's operations over these roads . <br /> C . Roadways damaged by CONTRACTOR shall be restored to their original <br /> condition by the CONTRACTOR subject to approval of the OWNER or <br /> ENGINEER . <br /> D . Remove temporary roads , walks and parking areas prior to final acceptance and <br /> return the ground to its original condition , unless otherwise required by the <br /> Contract Documents . <br /> 1 . 2 USE OF PUBLIC STREETS <br /> The use of public streets and alleys shall be such as to provide a minimum of <br /> inconvenience to the public and to other traffic . Any earth or other excavated <br /> material spilled from trucks shall be removed immediately by the CONTRACTOR <br /> and the streets cleaned to the satisfaction of the Owner. <br /> 1 . 3 USE OF PUBLIC STREETS FOR HAUL ROADS <br /> A. Prior to construction , the CONTRACTOR shall designate all proposed haul <br /> roads to be used during the life of the project . Any earth or other materials <br /> spilled from trucks shall be removed by the CONTRACTOR and streets <br /> cleaned to the satisfaction of the Owner. He further shall be responsible for <br /> repairs to any damages caused by his operations , prior to final payment. <br /> 01550 Access Roads <br /> 01550- 1 <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\1102-Old Dixie Hwy Swk 8th St to SR 60=LAP\Admim\bid documents\Master <br /> Contract Documents\01550 as Access Roads.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.