Laserfiche WebLink
PART 1 — GENERAL <br /> 1 . 1 SCOPE <br /> A . This Section covers erosion control and the treatment of dewatering water and stormwater <br /> runoff from the construction site and work area . The pollution control measures shall <br /> prevent turbid or otherwise polluted waters from being discharged from the construction <br /> site or work area , to undeveloped portions of the site or off-site . <br /> Be The OWNER considers pollution from dewatering water and stormwater runoff from a <br /> construction site or work area to be a very serious offense . The CONTRACTOR is <br /> solely responsible for preventing pollution caused by dewatering water and stormwater <br /> runoff from the construction site or work area . <br /> C . The pollution control measures specified herein represent minimum standards to be <br /> adhered to by the CONTRACTOR throughout the Project's construction . The OWNER <br /> reserves the right to require the CONTRACTOR to employ additional pollution control <br /> measures , when in the sole opinion of the OWNER , they are warranted . If site specific <br /> conditions require additional erosion and stormwater pollution control measures during any <br /> phase of construction or operation to prevent erosion or to control sediment or other <br /> pollution , beyond those specified in the Drawings or herein , implement additional best <br /> management practices as necessary, in accordance with Chapter 4 , " Best Management <br /> Practices for Erosion and Sedimentation Control" of the Florida Erosion and Sediment <br /> Control Inspector' s Manual , and other references as may be required by regulatory <br /> permits . ( http : //www . dep . state .fl . us ,twater/nonpoint/docs/erosion/erosion-inspectors <br /> manual . pdf) <br /> D . The OWNER may terminate this Contract if the CONTRACTOR fails to comply with this <br /> Section . Alternatively , the OWNER may halt the CONTRACTOR' s operations until the <br /> CONTRACTOR is in full compliance with this Section . If the OWNER halts the <br /> CONTRACTOR' s work as a result of its failure to comply with this Section , the Construction <br /> Contract time clock will continue to run . <br /> E . In addition to these Specifications , comply with Chapter 4 - " Best Management Practices <br /> for Erosion and Sedimentation Control" and Chapter 5 — " Best Management Practices for <br /> Dewatering " of the Florida Erosion and Sediment Control Inspector's Manual . In the event <br /> of a conflict between the referenced Chapters and these Specifications , the more stringent <br /> requirement shall prevail . <br /> 1 . 2 SOME PERMITS TO BE OBTAINED BY THE CONTRACTOR <br /> A . The OWNER has obtained certain permits for this project and they are listed in <br /> paragraph SC-6 . 08 of the Supplementary Conditions . Per paragraph SC-6 . 08 . 0 of the <br /> Supplementary Conditions , the CONTRACTOR shall apply for, obtain , and pay for all <br /> other required permits , licenses , sampling , and tests . Permits the CONTRACTOR may <br /> 01025- 4 Technical Specifications <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1102-Old Dixie Hwy Swk 8th St to SR 60=LAPWdmim\bid documentswaster <br /> Contract Documents\Technical Specifications.doc <br />