Laserfiche WebLink
D . Inspect each pollution control system at least once per day and after each rainfall <br /> event. Clean and maintain each pollution control system as requiredby its <br /> manufacturer or the OWNER , until the system is no longer needed . If a water quality <br /> violation occurs , immediately cease all work contributing to the water quality violation <br /> and correct the problem . <br /> E . Discharge shall not violate State or local water quality standards in the receiving <br /> waters , nor cause injury to the public health or to public or private property , nor to the <br /> Work completed or in progress . The receiving point for water from construction <br /> operations shall be approved by the applicable owner, regulatory agency, and the <br /> ENGINEER . <br /> F . Promptly repair all damage at no cost to the OWNER . <br /> 1 . 4 SUBMITTALS <br /> A. Shop Drawings : Submit shop drawings of the proposed pollution control and treatment <br /> systems in accordance with Section 1340 . <br /> B . Stormwater Pollution Prevention Plan . <br /> 1 . 5 STATE CERTIFIED EROSION CONTROL SPECIALTY SUBCONTRACTOR IS <br /> REQUIRED FOR INSTALLATION , AND MAINTENANCE <br /> A . State Certified Erosion Control Specialty Subcontractor is Required for Installation and <br /> Maintenance : Installation and maintenance of all erosion and stormwater pollution <br /> control devices , shall be by a State Certified erosion control subcontractor who <br /> specializes in the installation and maintenance of such devices . After installation , this <br /> specialty subcontractor shall maintain the erosion and stormwater pollution control <br /> devices until in the ENGINEER' s sole opinion , the devices are no longer necessary <br /> (such time not to extend past the date the OWNER formally accepts the project as <br /> complete) . Before beginning construction , submit to Indian River County for review <br /> and approval , a Stormwater Pollution Prevention Plan (SWPPP) , prepared by the <br /> certified erosion control subcontractor. Construction shall not begin until the SWPPP <br /> has been approved by Indian River County . Submit the approved SWPPP to the <br /> ENGINEER before beginning construction . Include in the SWPPP , the "Contractor' s <br /> Affidavit Regarding Erosion Control and Treatment of Dewatering Water and <br /> Stormwater From the Construction Site" ( located at the end of this Section ) . <br /> 1 . 6 " POLLUTION " AND CERTAIN UNCONTESTABLE POLLUTION EVENTS DEFINED <br /> A. With respect to this Section and as may be further defined in paragraphs 1 . 6 . 13 , 1 . 6 . C , <br /> and 1 . 6 . D , "pollution " is the presence in off-site waters of any substances , <br /> contaminants , or manmade or human -induced impairment of off-site waters or <br /> alteration of the chemical , physical , biological , or radiological integrity of off-site water <br /> 01025- 6 Technical Specifications <br /> FAIDublic Works\ENGINEERING DIVISION PROJECTS\1102-Old Dixie Hwy Swk 8th St to SR 60-LAP\Admim\bid documentskmaster <br /> Contract Documents\Technical Specifications.doc <br />