My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-024
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 1:07:35 PM
Creation date
10/1/2015 1:35:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/07/2011
Control Number
2011-024
Agenda Item Number
none
Entity Name
Timothy Rose Contracting
Indian River Land Trust
Subject
Lagoon Greenway Phase 1 Construction Agreement
Area
Flinn Tract Florida Inland Navitgation District
Supplemental fields
SmeadsoftID
9231
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h too � <br /> J EXecu�d� T� <br /> LAGOON GREENWAY - PHASE 1 C d V rJ T <br /> CONSTRUCTION AGREEMENT Ap M 1 nl 1S A� o � <br /> THIS AGREEMENT made and entered into this day of 120 t i< by and Set, oJ+ <br /> between Timothy Rose Contracting, Inc . , hereinafter called the CONTRACTOR, and Indian River County, MU <br /> herein called the OWNER . <br /> WITNESSED : That whereas , the OWNER and the CONTRACTOR for the consideration hereinafter named, <br /> agree as set forth below : <br /> Article 1 . SCOPE OF WORK <br /> As per specifications of the Contract Documents for Indian River Lagoon Greenway - Phase 1 prepared by <br /> Knight, McGuire & Associates , Inc . for the Indian River Land Trust, in partnership with OWNER, such <br /> Contract Documents attached as Exhibit A to this Agreement, and in accordance with the following estimated <br /> construction costs (per CONTRACTOR ' S bid) ; <br /> LAGOON GREENWAY - PHASE 1 ESTIMATED CONSTRUCTION COSTS <br /> ITEM <br /> No. DESCRIPTION QTY UNIT UNIT PRICE AMOUNT <br /> 1 .00 ROAD RESURFACING <br /> 1 . 10 Mobilization 0.65 AC $ 3 , 000 . 00 $ 11950 - 00 _ <br /> 1 .20 Clearing Costs (small trees and underbrush) 0.65 AC $ 2 , 500 . 00 $ 11625 . 00 _ <br /> 1 .30 Rough Grading and Strip 6 in 0.25 AC $ 4 , 800 . 00 $ 11200 . 00 - <br /> 1 . 40 6" of Shell Rock for Parking / Vehicular Access 711 .00 SY $ 8 . 49 $ 61 036 . 39 - <br /> 1 . 50 Concrete apron and H .C . parking area 29. 10 CY $ 181 . 00 $ 51267 . 10 - <br /> 1 . 55 Concrete Curb Sawcut and Remove 63.00 LF $ 8 . 00 $ 504 . 00 - <br /> 1 .60 Railroad Ties - Curb Stops 17.00 EA $ 25 . 00 $ 425 . 00 - <br /> 1 .65 Concrete Curb Stops for H .C. Parking 2.00 EA $ 20 . 00 $ 40 . 00 - <br /> 1 .70 Signage and Striping includes removal of existing striping) 1 .00 LS $ 900 . 00 $ 900 . 00 - <br /> 1 .80 6' high AI-coated steel chain link fence 20.00 LF $ 22 . 00 $ 440 . 00 - <br /> 1 .85 Construction Fence 614.00 LF $ 1 . 00 $ 614 . 00 - <br /> 1 .90 6' High chain link gate - 15' wide 2.00 EA $ 1 , 035 . 00 $ 2 , 070 . 00 - <br /> 2 .00 Monument Entry Sin 1 .00 EA $ 3 , 000 . 00 $ 31000 . 00 - <br /> 2. 10 Road Way Sign 1 .00 EA $ 11 o . o o $ 11 o . o o - <br /> 2 .20 5' Wide Sidewalk - 4" Thick Concrete 76.00 LF $ 2 . 90 $ 220 . 40 - <br /> 2.30 Landscaping Costs 1 .00 LS $ 800 . 00 $ 800 . 00 - <br /> 2 .32 Sodding of swale/disturbed areas 2W0.00 SF $ 0 . 15 $ 300 . 00 - <br /> 2 . 35 Tree Removal 1 :00 EA $ 650 . 00 $ 650 . 00 - <br /> 2.40 Information Kiosks. 1 .00 EA $ 2 , 500 . 00 $ 21 500 . oo - <br /> 2. 50 Trail Signs 4.00 EA $ loo . oo $ 400 . 00 - <br /> 2.60 Picnic Tables 2.00 EA $ 400 . 00 $ 800 . 00 - <br /> 2.70 Garbage Can 4. 00 EA $ 50 . 00 $ 200 . 00 - <br /> 2.80 Bike Rack 1 . 00 EA 600 . 00 $ 600 . 00 - <br /> Sub-Total $ 30 651 . 89 - <br /> 2.00 PROFESSIONAL SERVICES <br /> 2.20 Soils/Material Testing 1 ,JOB $ 850 . 00 $ 850 . 00 - <br /> 2.30 Surveyor - Construction Staking 1 LS $ 1 , 00 () . 0C) - <br /> Sub-Total $ 1 , 8S0 , 00 - <br /> Grand Total $ - <br /> - 1 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.