Laserfiche WebLink
A1 ' ( QJe,cY I <br /> LAGOON GRE ENWAY - PHASE 1 <br /> CONSTRUCTION AGREEMENT Ap M 1 pi iS Afio <br /> THIS AGREEMENT made and entered into this day of �Jakt, yL 1201 by and Sec oJ-, - <br /> between Timothy Rose Contracting, Inc . , hereinafter called the CONTRACTOR, and Indian River County, - <br /> herein called the OWNER . <br /> WITNESSED : That whereas , the OWNER and the CONTRACTOR for the consideration hereinafter named , <br /> agree as set forth below : <br /> Article 1 . SCOPE OF WORK <br /> As per specifications of the Contract Documents for Indian River Lagoon Greenway - Phase 1 prepared by <br /> Knight , McGuire & Associates , hie . for the Indian River Land Trust, in partnership with OWNER, such <br /> Contract Documents attached as Exhibit A to this Agreement, and in accordance with the following estimated <br /> construction costs (per CONTRACTOR ' S bid) ; <br /> LAGOON GREENWAY - PHASE I ESTIMATED CONSTRUCTION COSTS <br /> ITEM <br /> No. DESCRIPTION QTY UNIT UNIT PRICE AMOUNT <br /> 1 .00 ROAD RESURFACING <br /> 1 . 10 Mobilization 0.65 AC $ 3o000 . 00 $ 11 950 . 00 - <br /> 1 .20 Clearing Costs (small trees and underbrush) 0.65 AC $ 2 , 500 . 00 $ 11625 . 00 - <br /> 1 .30 Rough Grading and Strip 6 in 0.25 AC $ 4 , 800 . 00 $ 11200 . 00 - <br /> 1 .40 6" of Shell Rock for Parking / Vehicular Access 711 . 00 SY $ 8 . 49 $ 61 036 . 39 - <br /> 1 .50 Concrete apron and H .C . parking area 29 . 10 CY $ 181 . 00 $ 51267 . 10 - <br /> 1 .55 Concrete Curb Sawcut and Remove 63 .00 LF $ 8 . 00 $ SO4 . 00 - <br /> 1 .60 Railroad Ties - CurbSto s 17.00 EA $ 25 . 00 $ 425 . 00 - <br /> 1 .65 Concrete Curb Stops for H.C. Parking 2.00 EA $ 20 . 00 $ 40 . 00 - <br /> 1 .70 Signage and Striping includes removal of existing striping) 1 .00 LS $ 9 o o . o o $ 9 o o . o o - <br /> 1 .80 6' high AI-coated steel chain link fence 20.00 LF $ 22 . 00 $ 440 . 00 - <br /> 1 .85 Construction Fence 614.00 LF $ 1 . 00 $ 614 . 00 - <br /> 1 .90 6' High chain link gate - 15' wide 2.00 EA $ 11035 . 00 $ 2 , 070 . 00 - <br /> 2.00 Monument Entry Sin 1 .00 EA $ 3 , 000 . 00 $ 31000 . 00 - <br /> 2. 10 Road Way Sign 1 .00 EA $ 11 o . o o $ 110 . 00 - <br /> 2 .20 5' Wide Sidewalk - 4" Thick Concrete 76.00 LF $ 2 . 90 $ 220 . 40 - <br /> 2 .30 Landscaping Costs 1 .00 LS $ 8 o o . o o $ e o o . o o - <br /> 2 . 32 Sodding of Swale/disturbed areas 200000 SF $ 0 . 15 $ 300 . 00 - <br /> 2 . 35 Tree Removal 1 :00 EA $ 650 . 00 $ 650 . 00 - <br /> 2.40 Information Kiosks 1 . 00 EA $ 2 , 500 . 00 $ 2 , Soo . 00 - <br /> 2.50 Trail Signs 4. 00 EA $ 100 . 00 $ 400 . 00 - <br /> 2. 60 Picnic Tables 2. 00 EA $ 400 . 00 $ 800 . 00 - <br /> 2. 70 lGarbage Can 4. 00 EA $ 50 . 00 $ 200 . 00 - <br /> 2 . 80 jBike Rack 1 .00 EA 600 . 00 $ 600 . 00 - <br /> Sub-Total $ 30 , 6 51 . 8 9 - <br /> 2.00 PROFESSIONAL SERVICES <br /> 2.20 Soils/Material Testing 1 ,JOB $ 850 . 00 $ 850 . 00 - <br /> 2.30 Surveyor - Construction Staking 1 LS $ 1 , 200 , op $ 1 , 0 () () . 00 - <br /> Sub-Total $ 1 , 8 - <br /> Grand Total $ - <br /> - 1 - <br />