Laserfiche WebLink
agency and the Engineer. The Contractor is responsible for obtaining all required permits and <br /> any other approval necessary . <br /> 6 ) REMOVAL OF MUCK , ROCK , AND OTHER UNSUITABLE MATERIAL <br /> A) All muck , rock , clay , marl , gravel , boulders , heterogeneous fill material and any other organic or <br /> unsuitable " materials of excavation" encountered under pavement areas , structures , and utilities , <br /> shall be excavated and distributed as determined by the Owner and Engineer (i . e . re-located <br /> on-site or removed ) . Also , any " unforeseen obstacles" , such as buried trees or timbers , <br /> abandoned utilities , metal objects , concrete masses , or any other type of debris encountered <br /> shall be removed . <br /> B) Stripping shall be accomplished to clean in-place sand or other suitable material as approved by <br /> the Engineer. Removal of unsuitable material within areas which are to receive footings , slabs , or <br /> other foundations shall be completed for the full area under such structures and to ten feet <br /> minimum outside the maximum perimeter. Where pavement is to be placed , said removal shall <br /> include all area under the surface to extend to the outside of shoulders and under sidewalks and <br /> bike paths , or as directed by the Engineer . <br /> C) All roots , stumps , logs , limbs , timbers , boulders , or any material which is not suitable for backfill <br /> material shall be removed from the site promptly and excavated and disposed of by the <br /> Contractor at his expense . <br /> D) All materials of excavation and " unforeseen obstacles " will be considered as incidental to <br /> construction and no additional compensation will be allowed . <br /> SW-2-2 <br />