My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-024
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 1:07:35 PM
Creation date
10/1/2015 1:35:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/07/2011
Control Number
2011-024
Agenda Item Number
none
Entity Name
Timothy Rose Contracting
Indian River Land Trust
Subject
Lagoon Greenway Phase 1 Construction Agreement
Area
Flinn Tract Florida Inland Navitgation District
Supplemental fields
SmeadsoftID
9231
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
agency and the Engineer. The Contractor is responsible for obtaining all required permits and <br /> any other approval necessary . <br /> 6 ) REMOVAL OF MUCK , ROCK , AND OTHER UNSUITABLE MATERIAL <br /> A) All muck , rock , clay , marl , gravel , boulders , heterogeneous fill material and any other organic or <br /> unsuitable " materials of excavation" encountered under pavement areas , structures , and utilities , <br /> shall be excavated and distributed as determined by the Owner and Engineer (i . e . re-located <br /> on-site or removed ) . Also , any " unforeseen obstacles" , such as buried trees or timbers , <br /> abandoned utilities , metal objects , concrete masses , or any other type of debris encountered <br /> shall be removed . <br /> B) Stripping shall be accomplished to clean in-place sand or other suitable material as approved by <br /> the Engineer. Removal of unsuitable material within areas which are to receive footings , slabs , or <br /> other foundations shall be completed for the full area under such structures and to ten feet <br /> minimum outside the maximum perimeter. Where pavement is to be placed , said removal shall <br /> include all area under the surface to extend to the outside of shoulders and under sidewalks and <br /> bike paths , or as directed by the Engineer . <br /> C) All roots , stumps , logs , limbs , timbers , boulders , or any material which is not suitable for backfill <br /> material shall be removed from the site promptly and excavated and disposed of by the <br /> Contractor at his expense . <br /> D) All materials of excavation and " unforeseen obstacles " will be considered as incidental to <br /> construction and no additional compensation will be allowed . <br /> SW-2-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.