areas . All of this work shall be included in the bid price for the units of work involved in the <br /> construction . <br /> 17 . EMERGENCY AND PUBLIC SAFETY - The Contractor is required to maintain 24-hour, 7 " <br /> day week communications facilities , labor, equipment and supplies to meet emergency <br /> repair situations , and correct any and all public safety hazards occasioned by performance <br /> of work under this contract . A telephone number to effect this service will be submitted to <br /> the Engineer and forwarded by him to the City Manager, Water and Sewer , Fire and Police <br /> Departments . <br /> Closing of streets for construction work requires prior 72-hour notice to Engineer, Fire and <br /> Police Department . Requests to shut off water or sewer service require prior 72-hour notice <br /> to Engineer , water and sewer department , and fire department . In all street closing and <br /> utility shutdowns , the residents so served also shall be notified 72 hours in advance by the <br /> Contractor. The Owner will operate or personally direct the closing or opening of any utility <br /> service at any and all times . <br /> 18 . NOTICES FROM CONTRACTOR REQUIRED BY OWNER - Notice shall be given to the <br /> Owner in writing , and acknowledged by the Owner 72 hours in advance for any action <br /> required of the Owner to close streets , shut off, or turn on of utilities , and resumption of <br /> inspection of the work after a stoppage of 48 hours , or more . Lack of acknowledgment in <br /> writing shall be prima-facia evidence that such notice was not given . <br /> 19 . SHOP DRAWINGS - The Contractor shall check and approve shop drawings before <br /> submitting them to the Engineer and Owner's Representative for approval . The shop <br /> drawings shall be forwarded in the following statement : <br /> "The Contractor by approving and submitting these shop drawings represents that he has <br /> determined and verified all field measurements and quantities , field construction criteria , <br /> materials , catalog numbers and similar data , and that he has reviewed and coordinated the <br /> information in the shop drawings with the requirements of the work and the contract <br /> documents ' <br /> Shop drawings will not be accepted directly from subcontractors or suppliers . <br /> Shop drawings that cannot be approved will be returned with reasons for rejection . <br /> Subsequent submissions shall be noted as revisions of the original submission . <br /> 20 . CONTRACTOR'S REPRESENTATIVE - The superintendent designated by the Contractor to <br /> supervise his work is to be removed form his capacity as the Contractor's representative , if <br /> found unsatisfactory , at the sole discretion of the Engineer, and replaced when the request <br /> for assignment of another representative is received by the Contractor. <br /> 21 . CORROSION PROTECTION - As the work progresses and it is determined by the Engineer <br /> that corrosion protection is necessary in certain areas , then ductile and cast iron pipe shall <br /> be encased in a polyethylene tube , unpigmented and having a minimum thickness of 8 <br /> mils , all in accordance with the requirements of the Cast Iron Pipe Research Association <br /> Specifications . Labor and material required to supply and install the polyethylene tube will <br /> be included in the unit price for this bid item . <br /> i <br /> SP-4 - <br />