<br /> perform any of the Work , or anyone for whose acts Documents , CONTRACTOR shall do all cutting ,
<br /> any of them may be liable , the indemnification fitting , and patching of the Work that may be required
<br /> obligation under paragraph 6 . 20 .A shall not be limited to properly connect or otherwise make its several
<br /> in any way by any limitation on the amount or type of parts come together and properly integrate with
<br /> such
<br /> damages , compensation , or benefits payable by or for other work . CONTRACTOR shall not endanger any
<br /> CONTRACTOR or any such Subcontractor, Supplier, work of others by cutting , excavating , or otherwise
<br /> or other individual or entity under workers ' compen - altering their work and will only cut or
<br /> alter their work
<br /> sation acts , disability benefit acts , or other employee with the written consent of ENGINEER and the others
<br /> benefit acts , whose work will be affected . The duties and
<br /> responsibilities of CONTRACTOR under this
<br /> C . The indemnification obligations of CON - paragraph are for the benefit of such utility owners and
<br /> TRACTOR under paragraph 6 . 20 .A shall not extend to other contractors to the extent that there are
<br /> the liability of ENGINEER and ENGINEER's comparable provisions for the benefit of
<br /> Consultants or to the officers , directors , partners , CONTRACTOR in said direct contracts between
<br /> employees , agents , and other consultants and OWNER and such utility owners and other
<br /> subcontractors of each and any of them arising out of: contractors .
<br /> 1 . the preparation or approval of, or the C . If the proper execution or results of any part of
<br /> failure to prepare or approve , maps , Drawings , CONTRACTOR's Work depends upon work per-
<br /> opinions , reports , surveys , Change Orders , formed by others under this Article 7 , CONTRACTOR
<br /> designs , or Specifications ; or shall inspect such other work and promptly report to
<br /> ENGINEER in writing any delays , defects , or deficien -
<br /> 2 . giving directions or instructions , or cies in such other work that render it unavailable or
<br /> failing to give them , if that is the primary cause unsuitable for the proper execution and results of
<br /> of the injury or damage . CONTRACTOR's Work . CONTRACTOR's failure to
<br /> so report will constitute an acceptance of such other
<br /> work as fit and proper for integration with
<br /> ARTICLE 7 - OTHER WORK CONTRACTOR's Work except for latent defects and
<br /> deficiencies in such other work .
<br /> 7 . 01 Related Work at Site 7 . 02 Coordination
<br /> A. OWNER may perform other work related to A. If OWNER intends to contract with others for
<br /> the Project at the Site by OWNER's employees , or let the performance of other work on the Project
<br /> at the
<br /> other direct contracts therefor, or have other work Site , the following will be set forth in
<br /> Supplementaryrrr
<br /> performed by utility owners . If such other work is not Conditions :
<br /> noted in the Contract Documents , then :
<br /> 1 . the individual or entitywho will h
<br /> 1 . written notice thereof will be given to have
<br /> 9 authority and responsibility for coordination of
<br /> CONTRACTOR prior to starting any such other the activities among the various contractors will
<br /> work ; and be identified ;
<br /> 2 . if OWNER and CONTRACTOR are 2 , the specific matters to be covered by
<br /> unable to agree on entitlement to or on the such authority and responsibility will
<br /> be
<br /> amount or extent , if any, of any adjustment in itemized ; and
<br /> the Contract Price or Contract Times that
<br /> should be allowed as a result of such other 3 , the extent of such authority and
<br /> work , a Claim may be made therefor as responsibilities will be provided ,
<br /> provided in paragraph 10 . 05 .
<br /> B . Unless otherwise provided in the
<br /> B . CONTRACTOR shall afford each other Supplementary Conditions , OWNER shall have sole
<br /> contractor who is a party to such a direct contract and authority and responsibility for such coordination ,
<br /> each utility owner (and OWNER , if OWNER is per-
<br /> forming the other work with OWNER's employees ) er
<br /> proper and safe access to the Site and a reasonable
<br /> opportunity for the introduction and storage of
<br /> materials and equipment and the execution of such
<br /> other work and shall properly coordinate the Work with
<br /> theirs . Unless otherwise provided in the Contract
<br /> — 26 00700 - General Conditions REV 04-07 . doc
<br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0923A Trans Florida Greenway (At Sebastian an River Middle School )\Admim\Contract Documents\00700 - General
<br /> Conditions REV
<br /> 04-07 doc
<br />
|