My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-227B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-227B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 10:31:08 AM
Creation date
10/1/2015 3:08:21 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/08/2011
Control Number
2011-227B
Agenda Item Number
8.B.
Entity Name
Timothy Rose Contracting
Subject
Trans-Florida Greenway Trail North County Park to Sebastian Crossings
Trans-Florida Railroad Corridor
Area
Trans-Florida Greenway Trail
Project Number
0923A
Bid Number
2012011
Archived Roll/Disk#
112-0008-R
Supplemental fields
SmeadsoftID
10416
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IL <br /> I If <br /> ARTICLE 8 - OWNER 'S RESPONSIBILITIES 8 . 09 Limitations on OWNER 's Responsibilities <br /> 8 . 01 Communications to Contractor A. The OWNER shall not supervise , direct , or <br /> have control or authority over, nor be responsible for, <br /> CONTRACTOR's means , methods , techniques , se- <br /> A. Except as otherwise provided in these quences , or procedures of construction , or the safety <br /> General Conditions , OWNER shall issue all communi- <br /> Precautions and programs incident thereto , or for any <br /> cations to CONTRACTOR through ENGINEER . <br /> failure of CONTRACTOR to comply with Laws and <br /> 8 . 02 Replacement of ENGINEER Regulations applicable to the performance of the <br /> Work . OWNER will not be responsible for <br /> CONTs failure to perform A. In case of termination of the employment of accco dan eTORwiithhrthe <br /> Contract Documents , Work in <br /> ENGINEER , OWNER shall appoint an engineer to <br /> whom CONTRACTOR makes no reasonable <br /> objection , whose status under the Contract on Undisclosed Hazardous Environmental <br /> C <br /> Documents shall be that of the former ENGINEER . Condition <br /> 8 . 03 Furnish Data A. OWNERS responsibility in respect to an <br /> undisclosed Hazardous Environmental Condition is <br /> A. OWNER shall promptly furnish the data set forth in paragraph 4 . 06 , <br /> required of OWNER under the Contract Documents , <br /> 8 . 11 Evidence of Financial Arrangements <br /> 8 . 04 Pay Promptly When Due A. If and to the extent OWNER has agreed to <br /> furnish CONTRACTOR reasonable evidence that <br /> If A. OWNER shall make payments to CONTRAC- financial arrangements have been made to satisfy <br /> TOR promptly when they are due as provided in OWNER's obligations under the Contract Documents , <br /> 44 <br /> paragraphs 14 . 02 . 0 and 14 . 07 . C . OWNER's responsibility in respect thereof will be as <br /> 8 . 05 Lands and Easements; Reports and Tests set forth in the Supplementary Conditions , <br /> A . OWNER's duties in respect of providing lands ARTICLE 9 - ENGINEER 'S STATUS DURING <br /> and easements and providing engineering surveys to CONSTRUCTION <br /> establish reference points are set forth in paragraphs <br /> 4 . 01 and 4 . 05 . Paragraph 4 . 02 refers to OWNER's <br /> identifying and making available to CONTRACTOR 9 . 01 OWNER 'S Representative <br /> copies of reports of explorations and tests of <br /> subsurface conditions and drawings of physical A. ENGINEER will be OWNER's representative <br /> conditions in or relating to existing surface or during the construction period . The duties and <br /> subsurface structures at or contiguous to the Site that responsibilities and the limitations of authority of <br /> have been utilized by ENGINEER in preparing the ENGINEER as OWNER's representative during <br /> Contract Documents , construction are set forth in the Contract Documents <br /> 8 . 06 Insurance and will not be changed without written consent of <br /> OWNER and ENGINEER . <br /> A. OWNER's responsibilities , if any, in respect to 9 . 02 Visits to Site <br /> purchasing and maintaining liability and property insur- <br /> ance are set forth in Article 5 , A. ENGINEER will make visits to the Site at <br /> 8 . 07 Change Orders intervals appropriate to the various stages of construc- <br /> tion as ENGINEER deems necessary in order to <br /> observe as an experienced and qualified design <br /> A. OWNER is obligated to execute Change professional the progress that has been made and the <br /> Orders as indicated in paragraph 10 . 03 . quality of the various aspects of CONTRACTOR's <br /> executed Work . Based on information obtained <br /> 8 . 08 Inspections, Tests, andApprovals pprovals during such visits and observations , ENGINEER , for <br /> the A. OWNERS responsibility in respect to certain the Wo klisofroceding will determine <br />, in general , if <br /> the <br /> inspections , tests , and approvals is set forth in tract Documents . ENGINEER win accorilll ance not bet required oto <br /> paragraph 13 . 03 . 6 . make exhaustive or continuous inspections on the Site <br /> to check the quality or quantity of the Work . <br /> 00700 - General Conditions REV 04-07 . doc <br /> F :\Pu lis <br /> 04-07 .doc <br /> Works\ENGINEERING DIVISION PROJECTS\0923A Trans Florida Greenway <br /> (At00700 - 27 Rier Middle School )V\dmim\Contract Documents\00700 - General Conditions REV <br /> ic <br /> WNW <br /> INN <br /> 1If <br /> If 777 <br /> If <br /> , <br />
The URL can be used to link to this page
Your browser does not support the video tag.