My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-134B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-134B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 10:22:50 AM
Creation date
10/1/2015 2:40:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/14/2011
Control Number
2011-134B
Agenda Item Number
8.D.2
Entity Name
Unified Recovery Group, LLC
Subject
Disaster Debris Removal and Disposal
Secondary Contract
Bid Number
2011040
Supplemental fields
SmeadsoftID
9990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATION /COORDINATION <br /> The OWNER and its authorized representatives shall be permitted access at every facility or <br /> property for the inspection of all work . <br /> Work by OWNER : The County hereby reserves the right to perform activities in the area where work <br /> is being done under this contract with its own forces . <br /> Work by Other CONTRACTORS : The County hereby reserves the right to permit other <br /> CONTRACTORS to work within the area , which is the site of the work under this contract . <br /> Coordination : CONTRACTOR shall afford OWNER and other CONTRACTORS reasonable <br /> opportunity for the introduction and storage of their equipment , materials and the execution of their <br /> work concurrently , and shall properly coordinate its work with theirs in the best interest of <br /> the <br /> County . <br /> COMMENCEMENT OF WORK <br /> The work shall commence immediately upon receipt of a Notice to Proceed . The Contractor shall <br /> mobilize within 72 hours of receiving Notice to Proceed . <br /> PAYMENT AND PERFORMANCE BONDS <br /> Within three ( 3) normal workdays after receiving a Notice to Proceed from the County , the Contractor <br /> shall furnish the County with a Public Construction Bond in accordance with Florida Statutes Section <br /> 255 . 05 , each in the sum of five million dollars ($ 5 , 000 , 000 . 00) . The Surety shall be authorized to <br /> issue surety bonds in Florida and be included in the most recent United States Department of <br /> Treasury List of Acceptable Sureties . One fully executed copy of each of the Payment Bond and the <br /> Performance Bond shall be recorded at the County Courthouse . The Performance Bond shall <br /> continue in effect for one ( 1 ) year after Substantial Completion and acceptance of the Work as a <br /> guarantee that the workmanship and materials are free from construction defects . Each Bidder shall <br /> submit evidence of bondability with their bid , documentation that the Bidder is capable of obtaining a <br /> bond in the sum of $ 5 , 000 , 000 . 00 . <br /> DEFECTIVE EQUIPMENT <br /> All equipment furnished or work performed , when not in accordance with the intent of these <br /> Specifications , shall be rejected and shall be removed immediately and replaced by suitable and <br /> r equipment will not prevent later <br /> satisfactory equipment . Failure to reject any defective work o <br /> rejection when such a defect is discovered and shall not relieve the CONTRACTOR of his obligation <br /> to fulfill his contract even though such work and equipment have been previously inspected by the <br /> OWNER and accepted ; it shall not obligate the OWNER to final acceptance nor shall it prevent the <br /> OWNER in any time subsequent from recovering damages from work actually shown to be defective <br /> within a one ( 1 ) year period after the final acceptance . <br /> If the CONTRACTOR fails to remove <br /> any <br /> atdefective <br /> pensework <br /> of the CONTRACTOROWNER shall have the <br /> right to stop work and remedy the cause <br /> If the OWNER deems it expedient to accept minor imperfect work , the OWNER shall have the right <br /> to retain such work and an equitable deduction shall be made in the Contract price . <br /> Page 10 of 30 <br /> F :\PublicWorks\Hurricane - Disaster Prepared ness\Hurrica11 \Debrisso Removal Bid & contract docs\Hurricane Debris Removal Bid <br /> Doc 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.