Laserfiche WebLink
K The Contractor shall insure that all vehicles , trucks , equipment , and trailers operating on Indian River <br /> County roadways and rights - of-way are in compliance with all Federal , State , and local rules , laws , <br /> and regulations . All vehicles , equipment , trucks , and trailers shall be properly licensed , insured , and <br /> equipped with lights , back- up alarms , horns , and any other safety equipment mandated by Federal , <br /> State , and local rules , laws , and regulations . Vehicles without proper safety equipment shall not work <br /> in the County . <br /> L The Contractor shall supply pre - numbered 5 part Debris Load Tickets to the County for the entire <br /> project . Each ticket will contain the following information : <br /> • Ticket Number <br /> • Contractor Name <br /> • Truck Number <br /> • Loading Location <br /> • Field Inspector <br /> i Measured Truck Capacity <br /> • Date <br /> • Site Departure Time <br /> • Dump Site Location <br /> • Dump Site Arrival Time <br /> 0 Debris Classification (Vegetative , C & D , Mixed ) <br /> Estimated % Full and Debris Quantity <br /> M The Contractor shall notify the County at least 3 days in advance of any unusual " ramping up" of <br /> work forces . <br /> M No home made trailers with plywood extensions will be permitted . Trailers towed behind trucks must <br /> be able to mechanically dump on their own with no assistance from equipment at the dumping site . <br /> O The Contractor shall only utilize mechanical loading equipment with grapple or clamshell type <br /> devices for loading debris . Hand loading will be prohibited . <br /> P All transport hauling equipment shall be single axle , tandem wheel , or semi -trailer trucks that are <br /> designed by the manufacturer for the intended purpose . No plywood extended sides will be <br /> permitted . Steel side extensions that have steel reinforced vertical supports are allowed . <br /> Q All transport hauling equipment shall be equipped with tailgates that extend upward minimally to <br /> the height of the sides of the box . <br /> R All loaded trucks and trailers shall be tarped or covered during transport . <br /> S The Contractor shall meet minimum production demands established by the County and begin debris <br /> removal phasing (c & d removal and mulch reduction and hauling ) within three days of the County ' s <br /> request . <br /> T All collection activities shall be directed in a logical , sequential manner, approved by the County , with <br /> no materials skipped over or left behind . <br /> U The Contractor shall assure that all subcontractors have English speaking supervisors or <br /> representatives available in the field at all times during the contract period . <br /> Page 28 of 30 <br /> F: IPublic WorkslHurricane = Disaster PreparednesslHurricane 20111Debris Removal Bid & Contract docsWurricane <br /> Debris Removal Bid Doc 03-0141 . doc <br />