My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-134B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-134B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 10:22:50 AM
Creation date
10/1/2015 2:40:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/14/2011
Control Number
2011-134B
Agenda Item Number
8.D.2
Entity Name
Unified Recovery Group, LLC
Subject
Disaster Debris Removal and Disposal
Secondary Contract
Bid Number
2011040
Supplemental fields
SmeadsoftID
9990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V The Contractor shall repair immediately upon request any damage caused by the debris removal <br /> operation that is deemed a public safety issue , including , but not limited to , asphalt , sidewalks , <br /> culvert pipes , swales , driveways , and/or any public or private property . <br /> W If it is determined to be in the best interest of Indian River County to use County owned properties for <br /> the debris - staging areas/processing -sites , the Contractor shall credit the County $ 1 . 00 per cubic yard <br /> for the total cubic yards collected for the use of the property . <br /> X The Contractor shall provide the following facilities at each debris - staging area/processing -site , <br /> regardless of who provides the site ( Contractor or County) : <br /> 1 . Each processing site shall have a roofed inspection tower erected upon it sufficient to support a <br /> minimum of three inspectors , and built to a height to allow a clear view down into a loaded truck . <br /> Mechanical lifts are discouraged . <br /> 2 . Each processing site shall have a temporary roofed shelter or canopy erected for the comfort of <br /> support staff and personnel from weather conditions . <br /> 3 . Each processing site shall have at least two portable sanitary units ( porta - potties ) that are clean <br /> and regularly maintained throughout the contract period . The Contractor shall keep an adequate <br /> supply of toilet paper in each unit . <br /> 4 . The Contractor shall provide stabilized ingress and egress to each debris- processing site and <br /> shall maintain such access throughout the contract period . <br /> Y All loads brought to a temporary debris - processing site shall be inspected and recorded by the <br /> Contractor and the County . <br /> Z The Contractor shall reclaim the site upon completion of the processing activities to include at a <br /> minimum removal of all equipment and debris , grading of the site to historical condition , and seeding <br /> and mulching of the exposed areas . <br /> Compliance of Federal , State , and Local Laws , Rules , and Regulations <br /> All processing activities shall be conducted in compliance with all federal , state , and local laws , rules , <br /> and regulations . <br /> i ) The Contractor shall be responsible for obtaining and paying for all permits needed to <br /> construct , operate , maintain , close , and reclaim the debris processing sites . <br /> ii ) The Contractor shall be responsible for any environmental sampling required at the debris <br /> staging area . Normally areas used to stage vegetative debris do not require any <br /> environmental sampling . Areas used to stage mixed debris , or ash from burning mixed <br /> debris , will normally require environmental sampling to close the site after the debris or ash is <br /> removed . It would also be advisable to sample the area prior to staging any mixed debris to <br /> identify any existing contamination at the site . <br /> iii ) The Contractor shall maintain the site in accordance with all local , state , and federal laws , <br /> rules , and regulations including at a minimum erosion control , storm water management , and <br /> fire control . <br /> iv) The Contractor shall not be responsible for C & D disposal fees at the County landfill . <br /> Page 29 of 30 <br /> PIPublic WorkslHurricane - Disaster PreparednesslHurricane 20111Debris Removal Bid & Contract docslHurricane <br /> Debris Removal Bid Doc 03-01 - 11 . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.