My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-082
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2016 12:27:30 PM
Creation date
10/1/2015 1:52:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/05/2011
Control Number
2011-082
Agenda Item Number
8.I.
Entity Name
Universal Engineering Sciences, Inc.
Subject
Oslo Road Phase II road widening
Area
43rd Ave. to 27th Ave. Oslo Road
Project Number
0533
Supplemental fields
SmeadsoftID
9499
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> LOCATIONS: <br /> Atlanta <br /> UNIVERSAL M Daytona Beach <br /> ENGINEERING SCIENCES • Fort Myers <br /> • FortPierce <br /> Consultants In: Geotechnical Engineering • Environmental Sciences • Gainesville <br /> • Jacksonville <br /> Geophysical Services • Construction Materials Testing ° Threshold Inspection • Kissimmee <br /> Building Inspection • Plan Review • Building Code Administration • Leesburg <br /> Miami <br /> Ocala <br /> Orlando (Headquarters) <br /> L� <br /> February 15 , 2011 o (� n Panama Cit <br /> Panama City• <br /> • Pensacola <br /> Rockledge <br /> Sarasota <br /> Mr . Mike Nixon Tampa <br /> Roadway Production Manager West Palm Beach <br /> Indian River County Engineering Division <br /> 1801 27th Street <br /> Vero Beach , FL 32960 <br /> Reference : Budget Estimate Proposal for Construction Materials Testing Services <br /> Oslo Road Improvements from 43rd Ave to 27th Ave <br /> Indian River County , Florida <br /> Universal Proposal Number : 0310 . 0211 . 00012 <br /> UES DOCS Number : 881184 <br /> Dear Mr . Nixon : <br /> Universal Engineering Sciences , Inc . ( Universal ) is pleased to provide this proposal for <br /> Construction Materials Testing ( CMT) services at the above- referenced project in accordance <br /> with the project specifications and Indian River County requirements . <br /> We are confident that our experience , quality of service , professional attitude and proximity to <br /> the site will be of value throughout the design and construction phases of the project . <br /> PROJECT DESCRIPTION <br /> We understand that this � roject is the 2nd phase of roadway improvements on Oslo Road <br /> from 43rd Avenue to 27t Avenue in Indian River County , Florida . These improvements <br /> include stormwater utility installation , new sidewalk installation , roadway reconstruction , <br /> widening and resurfacing . We estimate the following quantities : <br /> • +/- 300 LF of 2 foot depth of embankment fill <br /> • +/- 57000 LF of stabilized subgrade and base course on Oslo Road <br /> • +/- 4 asphaltic concrete driveways with stabilized subgrade and base course <br /> +/- 57100 LF of storm drain and 10 cross drains <br /> • +/- 42 storm drain structures/inlets <br /> • +/- 16 , 100 SY of mill and overlay 1 " SP 9 . 5 <br /> • +/- 361500 SY of 2 " SP 12 . 5 and 1 " SP 9 . 5 <br /> • +/- 11 , 000 LF of curb and gutter including intersecting streets <br /> 0 +/- 67500 LF of sidewalk <br />
The URL can be used to link to this page
Your browser does not support the video tag.