Laserfiche WebLink
Oslo Road Improvements from 43"' Ave to 27`h Ave <br /> Universal Proposal No. 0310. 0211 . 00012 <br /> Page 2 <br /> SCOPE OF WORK <br /> Based on review of the project documents and our experience in the area , Universal will <br /> provide the following : <br /> • On-call earthwork , asphalt and concrete testing <br /> • Engineering overview of our services <br /> The laboratory testing will be performed out of our Fort Pierce , Florida office with additional <br /> support from our Rockledge , Florida office , if required . During the duration of the project all <br /> technicians and personnel involved with the construction testing and inspection will be <br /> supervised by a Professional Engineer ( P . E . ) registered in the State of Florida . <br /> The following assumptions were made to develop the estimated scope of services : <br /> • Roadway construction will be phased into two separate operations , one per travel <br /> direction , and compaction tests will be performed every 500 linear feet . <br /> • Curb pad , sidewalk subgrade , and stabilized shoulders will be constructed as separate <br /> operations from the mainline roadway construction , and compaction density tests will <br /> be performed every 500 linear feet . <br /> • Stabilized subgrade will be sampled and tested for Limerock Bearing Ratio ( LBR) <br /> every 1 , 000 linear feet per width of roadway operation . Compaction density tests will <br /> be performed every 500 linear feet as a single 12 -inch lift . <br /> • Base course will be sampled and tested for Limerock Bearing Ratio ( LBR) every 2 , 000 <br /> linear feet per width of roadway operation . Compaction density tests will be performed <br /> every 500 linear feet as two 4- inch lifts . <br /> • Utility pipe trenches and structure backfill will be tested for compaction density for the <br /> full depth of fill in 6 - inch lifts at 100 % of a standard Proctor test (AASHTO T99 ) in <br /> accordance with the project plans . Tests will be performed at a minimum frequency of <br /> one per every 200 linear feet or one per pipe run . <br /> • Embankment will be tested for compaction density at a frequency of one per every 500 <br /> linear feet . <br /> • Asphalt will be tested in accordance with FDOT Local Area Practice ( LAP ) <br /> specification for Superpave asphalt . LAP testing specification consists of one <br /> extraction gradation and three cores for thickness and density for each day ' s <br /> placement . <br /> Cost of Services <br /> The services listed herein will be invoiced on a unit rate basis per the estimated scope . Note <br /> that the budget is an estimate of our services and may change as the result of unforeseen <br /> events such as requested standby time , overtime , retesting , etc . Pick up charges are not <br /> included in soil or concrete testing rates . A minimum of four density tests are required per <br /> trip . The estimated cost of services is separated into three individual phases based on the <br /> construction documents . <br /> Soils <br /> In Place Density Tests ( embankment) <br /> Estimate 16 each @ $24 . 00/each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 384 . 00 <br />