QUESTION NOe f <br /> Being that any lighting system will have to instill poles: on the edge o1 ' existing <br /> Canals , are there goimg to be any requirements fob' erosion control plans? <br /> The poles will not be in canalright-ofway, thus should have ample dFstance from <br /> proposed poles to top of bank. of canal . Erosion control plans are not required, <br /> however, if the contractor ' s construction operation ;requires dewatering; plans , then <br /> appropriate permitting may be required , <br /> ls 'the contract going to he responsible for the removal and reinstallation of fencing . <br /> 1br installation of poles? <br /> ANSWER , <br /> The contractor will be . res onsible for removal and reinstallation o fencing <br /> p n f for <br /> installation of the poles . The cost of this is to be included in the cost ofthe project. <br /> Also, the cost of all work necessary to satisfactorily complete the requirements of this <br /> protect shall be included in the hid price for the project. l <br /> I <br /> QUESTION NO. 9 <br /> Will there be a period of time allowed for the procurement of material land review of <br /> designs and submittals prior to notice to proceed? <br /> ANSWER. <br /> Alter approval of construction plans and all permits obtained, a 30 calendar day <br /> procurement time for acquisition ofmaterials will. be provided . (The contract time <br /> will be suspended dining the 30 day procurement time . See attached Street 1 .1 and. <br /> Sheet 21 . <br /> Page 4 of 8 <br /> F: IPerblirWorWF,MCUN1sERINGDIVISION PROJECTS1.1042MR .S�nrlsVillageIigbtinglAa)41htlhidd"ri teNklt4d4endtimslATlF)ENn(Ipf ,IV030I-17- <br /> I Lder <br />