My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-020
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 11:28:02 AM
Creation date
10/1/2015 1:44:20 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
02/01/2011
Control Number
2011-020
Agenda Item Number
8.H.
Entity Name
Electrical Contracting Service Inc.
Vero Beach Sports Village
Subject
Bid Award Lighting System County Funding Project
Area
Vero Beach Sports Village
Project Number
1042
Bid Number
2011025
Alternate Name
Dodgertown
Supplemental fields
SmeadsoftID
9284
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUESTION NOe f <br /> Being that any lighting system will have to instill poles: on the edge o1 ' existing <br /> Canals , are there goimg to be any requirements fob' erosion control plans? <br /> The poles will not be in canalright-ofway, thus should have ample dFstance from <br /> proposed poles to top of bank. of canal . Erosion control plans are not required, <br /> however, if the contractor ' s construction operation ;requires dewatering; plans , then <br /> appropriate permitting may be required , <br /> ls 'the contract going to he responsible for the removal and reinstallation of fencing . <br /> 1br installation of poles? <br /> ANSWER , <br /> The contractor will be . res onsible for removal and reinstallation o fencing <br /> p n f for <br /> installation of the poles . The cost of this is to be included in the cost ofthe project. <br /> Also, the cost of all work necessary to satisfactorily complete the requirements of this <br /> protect shall be included in the hid price for the project. l <br /> I <br /> QUESTION NO. 9 <br /> Will there be a period of time allowed for the procurement of material land review of <br /> designs and submittals prior to notice to proceed? <br /> ANSWER. <br /> Alter approval of construction plans and all permits obtained, a 30 calendar day <br /> procurement time for acquisition ofmaterials will. be provided . (The contract time <br /> will be suspended dining the 30 day procurement time . See attached Street 1 .1 and. <br /> Sheet 21 . <br /> Page 4 of 8 <br /> F: IPerblirWorWF,MCUN1sERINGDIVISION PROJECTS1.1042MR .S�nrlsVillageIigbtinglAa)41htlhidd"ri teNklt4d4endtimslATlF)ENn(Ipf ,IV030I-17- <br /> I Lder <br />
The URL can be used to link to this page
Your browser does not support the video tag.