Laserfiche WebLink
QUESTION N®a 0 <br /> W1 11 there be a building permit requi red as well as an electrical pear it? <br /> ANSWER. <br /> A building permit for the pole design, electrical facilities, wind load c:.alculatioaxs , <br /> etc . , along with an electrical permit are required. Cost of these permits will be the <br /> responsibility of the contractor. Contact IRC. Building Division for further <br /> information at (772) 2.26- 1. 260 . <br /> QUESTION NO . 11 <br /> Can there be an allowance set within the bid for all bidders that will f ind. 'the impact <br /> fees for the transfortner? <br /> ANSWER : <br /> Impact fees for the new -transformer will be paid separately by Indian River County . <br /> QUESTION II. ION 0a 12 <br /> Considering the first light test; please clarify if initial :light levels are required by the <br /> manufacturer in the submittals`.' I:t is ;any understanding that :Minor League Baseball <br /> requires a . 7 Light. Loss Factor. Please confirm? <br /> ANSWER , <br /> Initial light levels are required by the manufacturer in the submittals , Il, ight Loss <br /> Factor has been changed to . 7 as shown in response to Question No . 1 . <br /> Page 5 (?f 8 <br /> F: 17'ah/ic ifznrlrcl E,NG7NEERING DI FIVION PROJECTS11Q42 tB Sports 6911nge LightingL4dmimthid dgcummOiAddtpda6ni,g1117)FND7JRf NO 3 0747- <br /> 111 doe <br />