My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-011
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2026 10:52:44 AM
Creation date
10/1/2015 1:56:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
01/05/2010
Control Number
2010-011
Agenda Item Number
15.B.2
Entity Name
Waste Management Inc. of Florida
Subject
Vertical Expansion Class I Landfill Borrow Pond
Final Payment and Release of Retainage Final Application No. 7
Area
IRC Landfill Facility
Supplemental fields
SmeadsoftID
9528
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec <br />consultants <br />Mr. Himanshu H. Mehta, P.E. <br />Managing Director <br />Solid Waste Disposal District <br />Indian River County <br />132574 1h Avenue SW <br />Vero Beach, Florida 32968 <br />Subject: Certification of Construction Completion <br />Vertical F,xpansion and Partial Closure Construction Project <br />Indian River County Class I Landfill <br />Vero Beach, Indian River County, Florida <br />Dear Mr. Mehta: <br />1200 Riverplace Blvd. <br />Suite 710 <br />Jacksonville, Florida 32207 <br />PH 904.858.1818 <br />FAX 904.396.1143 <br />x,14 u, gens vn', ec, a m <br />29 October 2009 <br />Geosyntec Consultants (Gcosyntec) provided engineering and construction quality assurance (CQA) services for <br />the vertical expansion and partial closure construction project at the Class I Landfill of the Indian River County <br />Landfill facility. The purpose of this letter is to document that, based on the CQA and engineering support services <br />performed by Gcosyntec, construction of the vertical expansion and partial closure project is substantially complete. <br />All punch list items identified by Gcosyntec CQA personnel have been completed, as indicated in the 23 October <br />2009 e-mail from Rick Hastie of Geosyntec. We have also reviewed and approved (for payment by SWDD) <br />invoices through September 30, 2009 submitted by Waste Management, Inc. of Florida (WMIF), the Construction <br />Manager for the construction project. It is our understanding that one or more invoices will be submitted by WMIF. <br />Gcosyntec has also completed and submitted the CQA Construction Certification report for the vertical expansion <br />component to Florida Department of Environmental Protection (FDEP) Central District for review and approval. <br />The report was submitted to FDEP on 15 October 2009. However, FDEP would have to conduct a final inspection <br />before issuing approval of constnuction completion to allow waste placement in the vertical expansion cell. <br />Geosyntec is also in the process of completing the CQA Construction Certification report for the partial closure, gas <br />collection and control system (GCCS), and storm -water management system components of the project. This report <br />will be submitted to FDEP in November 2009. <br />If you have any questions or need additional information, please do not hesitate to contact the undersigned. <br />Sincerely, <br />Kwasi Badu-Tweneboah, Ph.D., P.I. <br />Project Manager <br />Copy: Debbie Perez, WMIF <br />Sheree Grant, WMIF <br />Wade Tyner, Geosyntec <br />Rick Hastie, Geosyntec <br />P:\PROJI\2009\FL1537 IRC SWDD (CLASS I LANDFILL VERTICAL EXPANSION & CONST SUPPORT)\Reporting\QA_QC <br />eff �cgoilM194pS,! �❑1Va1 IOJM ��SCompletion Undoc <br />Ci J <br />
The URL can be used to link to this page
Your browser does not support the video tag.