Laserfiche WebLink
Indian River Coun Class I Vertical Ex ansioo and Partial Closure Pro'ect Schedule Extension <br /> Original Project Schedule June 1 , 2009 to October 1 , 2009 <br /> Revised Project Schedule June 1 , 2009 toOctober 16 , 2009 <br /> Number of Added Da s to Schedule T5— <br /> Change <br /> 5Chan a Order Work that contributed to extended schedule : <br /> Description of Work <br /> Assist County Staff to provide uanti of soil material at moisture s ecified b contract EChan Order Nos. Additional <br /> work Da s <br /> Remediate excessive leachate see conditions before contract work consistin of constructin liner com vents s gs 9: iQ 7i8 <br /> 19ndfilf #s 5 $ 13 5 <br /> ft Constructed field fitted features consistin of vertical ex ansion twttom tine€ berms and infill <br /> bottom [finer re airs 4 <br /> TOTAL EXTRA DAYS WORK s 7, 17, & 20 2 <br /> Conditions that contributed to extended schedule 11 <br /> Excessive rainfall Inches Added Work Da s <br /> June $_ 71 1 <br /> Ju 14-78 1 <br /> August 8,35 1 <br /> 5e tember 4 , 76 1 <br /> TOTAL 32 4 <br /> Other factors : <br /> Soil material available for contract work was often limited to excessively moist soil <br /> Additional work to interface C&D with Segment It areas includes added tackon berms and sod areas. <br />