My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-011
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 3:46:16 PM
Creation date
10/1/2015 1:56:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
01/05/2010
Control Number
2010-011
Agenda Item Number
15.B.2
Entity Name
Waste Management Inc. of Florida
Subject
Vertical Expansion Class I Landfill Borrow Pond
Final Payment and Release of Retainage Final Application No. 7
Area
IRC Landfill Facility
Supplemental fields
SmeadsoftID
9528
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River Coun Class I Vertical Ex ansioo and Partial Closure Pro'ect Schedule Extension <br /> Original Project Schedule June 1 , 2009 to October 1 , 2009 <br /> Revised Project Schedule June 1 , 2009 toOctober 16 , 2009 <br /> Number of Added Da s to Schedule T5— <br /> Change <br /> 5Chan a Order Work that contributed to extended schedule : <br /> Description of Work <br /> Assist County Staff to provide uanti of soil material at moisture s ecified b contract EChan Order Nos. Additional <br /> work Da s <br /> Remediate excessive leachate see conditions before contract work consistin of constructin liner com vents s gs 9: iQ 7i8 <br /> 19ndfilf #s 5 $ 13 5 <br /> ft Constructed field fitted features consistin of vertical ex ansion twttom tine€ berms and infill <br /> bottom [finer re airs 4 <br /> TOTAL EXTRA DAYS WORK s 7, 17, & 20 2 <br /> Conditions that contributed to extended schedule 11 <br /> Excessive rainfall Inches Added Work Da s <br /> June $_ 71 1 <br /> Ju 14-78 1 <br /> August 8,35 1 <br /> 5e tember 4 , 76 1 <br /> TOTAL 32 4 <br /> Other factors : <br /> Soil material available for contract work was often limited to excessively moist soil <br /> Additional work to interface C&D with Segment It areas includes added tackon berms and sod areas. <br />
The URL can be used to link to this page
Your browser does not support the video tag.