My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-223
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2015 11:24:14 AM
Creation date
10/1/2015 5:44:21 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/12/2013
Control Number
2013-223
Agenda Item Number
8.G.
Entity Name
Young's Communication Co.
Subject
Utility Conflicts US Highway 1 widening
Area
US Highway 1 south Oslo Road to County Line
Bid Number
2014-008
Supplemental fields
SmeadsoftID
12601
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 2 ENGINEER <br /> The project has been designed by Schulke, Bittle & Stoddard , LLC , hereinafter called <br /> ENGINEER , and who is to act as OWNER'S representative, assume all duties and <br /> responsibilities and have the rights and authority assigned to ENGINEER in the Contract <br /> Documents in connection with completion of the work in accordance with the Contract <br /> Documents. <br /> ARTICLE 3 CONTRACT TIME <br /> 3 . 1 The CONTRACTOR shall be substantially completed with the following timeframe <br /> (a) Within 10 calendar days from effective date of Notice to Proceed , <br /> Contractor shall complete the following tasks : <br /> 1 . Obtain all necessary permits . <br /> 2 . Receive approved shop drawings for all materials and equipment to <br /> be utilized in the job . <br /> 3 . Perform all photographic recording and documentation of conditions <br /> prior to construction . <br /> 4 . Locate all existing utilities in the area of work. <br /> 5 . Submit and secure approval of shop drawings . <br /> 6 . Mobilize all labor, equipment , and materials . <br /> 7 . Deliver and store all equipment and materials to the job site . <br /> 8 . Notify all utilities and other affected parties prior to initiating <br /> construction . <br /> ( b) From 16 calendar days to 330 calendar days from the effective date of <br /> Notice to Proceed , the CONTRACTOR shall complete the following tasks : <br /> 1 . Install all pipe and appurtenant items . <br /> 2 . Perform all testing . <br /> 3 . Restore all disturbed areas to their pre-construction <br /> condition . <br /> 4 . Correct all deficiencies noted by Engineer. <br /> Completion of all tasks outlined above (i . e . , Subparagraphs a) and b) constitutes <br /> Substantial Completion . <br /> ( b) From 330 calendar days to 370 calendar days from the effective date of <br /> Notice to Proceed , the CONTRACTOR shall complete the following tasks : <br /> 1 . Clean up project area . <br /> 2 . Remove all equipment and material from project site . <br /> 3 . Perform contract closeout procedures . <br /> 3 . 2 Completion of all tasks outlined above (i . e . , Subparagraphs a , b , and c) <br /> constitute Final Completion . <br /> 3 . 3 Liquidated Damages . OWNER and CONTRACTOR recognize that time is of the <br /> essence of this Agreement and that OWNER will suffer financial loss if the work is not <br /> 00530-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.