My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/11/1972
CBCC
>
Meetings
>
1970's
>
1972
>
10/11/1972
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:24:55 AM
Creation date
6/10/2015 2:27:46 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/11/1972
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 99 1972 <br />9 <br />hand delivered <br />lir. Jack G. Jennings, County administrator <br />Indian River County <br />Vero Beach, Florida 32960 <br />Dear Air. Jennings: Re: Phyl-Ann Terrace S/Div. <br />It is anticipated that construction on subject sub- <br />division will be completed within thirty days. <br />The value amount of the total construction project is <br />$62,689.55, of which total earned to date is $40,523.65. <br />This leaves a remaining contract balance of $22,165.90 <br />to complete the project. These figures are for the <br />total earned through ieptember 30th. Additional work <br />has been accomplished in the interim, and as stated it <br />is anticipated the project should be completed within <br />thirty_ days. <br />Sincerely, <br />rile <br />Arthur F. Snood, P.E. <br />AFS: mt <br />WOOD, BEARD AND ASSOCIATES, INC. <br />Consulting Engineers <br />Z* <br />THE BOSTON HOUSE • 239 S. INDIAN RIVER DRIVE • P.O. BOX 1449 O 1 <br />AREA .CODE 305 - 464-3537 • FORT PIERCE, FLORIDA 33450 r <br />ON MOTION BY COMMISSIONER Loy, SECONDED BY COMMISSIONER <br />MCCULLERS, THE BOARD UNANIMOUSLY APPROVED THAT PHYL-ANN TERRACE <br />SUBDIVISION BE ACCEPTED FOR FINAL APPROVAL AND THAT A CASHIERS <br />CHECK IN THE AMOUNT OF $22,165.90 BE POSTED WITH THE CLERK WHICH <br />WILL BE RETURNED UPON COMPLETION OF THE PROJECT. IT WAS ALSO <br />STIPULATED THAT THE COUNTY IS TO BE FURNISHED WITH A SET OF <br />COMPLETED "AS BUILT It PLANS CERTIFIED BY THE ENGINEER. <br />THE CHAIRMAN LEFT THE MEETING AND VICE CHAIRMAN Loy <br />PRESIDED. <br />THE ADMINISTRATOR STATED THAT AT A RECENT MEETING IT <br />WAS RECOMMENDED THAT AN OVERHEAD FIRE ESCAPE BE INSTALLED AT THE <br />SECOND FLOOR OF THE COURTROOM OF THE INDIAN.RIVER COUNTY COURTHOUSE. <br />-3 <br />OCT15. WA91 <br />111972 <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.