Laserfiche WebLink
residential units served is approximately $1,400. Figure 3.B.6 <br />shows the summary of cost and implementation schedule. Capital <br />improvement costs for 1990, 1995 and 2010 are $11,681,000, <br />$39,492,000 and $63,648,000, respectively. <br />GOAL, OBJECTIVES AND POLICIES <br />It is the goal of Indian River County to have an efficient system <br />of potable water provision to prevent degradation of existing <br />resources, promote orderly growth within the county service area, <br />and to meet existing and projected demands. <br />OBJECTIVE 1 Service Concurrent with Development <br />By 1991, the county will have adopted land development regulations <br />requiring potable water service to be provided concurrent with <br />development. <br />POLICY 1.1: New development within the unincorporated portion <br />of the Indian River County shall be approved only when <br />capacity is available to provide needed potable water service. <br />POLICY 1.2: All authorities within the county service are <br />operating potable water facilities shall monitor facility <br />demands and capacity information as development orders are <br />granted and shall continually advise the county of the <br />remaining capacity and changes in demand. <br />POLICY 1.3: The level of service standards for the county's <br />potable water facilities of 250 gallons per day (GPD) per <br />equivalent residential unit (ERU);-based-on-county-orditnance <br />No7-84—H8; are hereby adopted and shall be utilized for <br />determining the availability of facility capacity and the <br />demand generated by a development. Wellfield capacity, <br />storage capacity and delivery pressure shall be based on the <br />following. <br />Wellfield capacity shall be the average daily use plus the <br />largest well being out of service <br />Storage tank capacity shall be at least } of the average daily <br />consumption volume <br />High service pump capacity shall at least be equal to the <br />maximum daily demand <br />Pressures of the high service pumps for the county plants <br />shall be a minimum of 40 PSI delivery pressures. <br />