Laserfiche WebLink
ORDINANCE 93-x_ <br />2. Method. When required to construct or provide a required <br />bikeway segment(s), the developer shall: <br />a. Construct the required bikeway segment(s) if the <br />roadway and corresponding bikeway segment(s) are <br />designated as a primary pedestrian corridor and if <br />construction can satisfy the design and safety <br />criteria of the FDOT Bicycle Facilities Planning <br />and Design Manual. As an alternative, the <br />developer may delay construction by "Bonding -out <br />for Construction" of the segment(s) as described in <br />subsection 913.09(4)(c); or <br />b. Transfer to the County the obligation to construct <br />the required bikeway segment(s) by providing a cash <br />payment of funds equal to one hundred percent <br />(100%) of the estimated cost to construct the <br />required bikeway segment(s) and executing an <br />Agreement for the Transfer of Responsibility for <br />Required Improvements. <br />The developer shall be responsible for clearing and <br />grading the intended location of the required <br />bikeway segment(s) at the time clearing and grading <br />for the development project is performed. The <br />value of such clearing and grading shall be <br />reflected in the cash payment amount provided by <br />the developer. The cleared path shall be approved <br />by the Public Works Department and shall be <br />selected so as to maximize tree preservation while <br />maintaining compliance with the FDOT Bicycle <br />Facilities Planning and Design Manual. <br />Timing. The developer shall be responsible for providing the <br />required the bikeway segment(s) in compliance with subsection <br />913.09(4)(b)2.a. or be prior to receiving a Certificate of <br />Completion for Required Subdivision Improvements. However, in <br />the event the developer is required to construct the required <br />bikewa <br />develo <br />segment (s ) for a period of two ( 2 ) years beyona the sinal pian <br />approval date of the corresponding subdivision development. <br />In electing to Bond -out for Construction, the developer shall <br />provide a completed Contract for Construction for Remaining <br />Required Improvements and post security to guarantee the <br />completed Contract in conformance with subsection 913.10(1). <br />The developer shall have the ability to extend the Contract <br />for Construction and posted security for a period of two (2) <br />years, in addition to the original two (2) years, upon <br />approval of both the Public Works Director and the Community <br />Development Director. <br />SECTION 12C: Section 913.09(5), Design Standards and Requirements, <br />Sidewalks, is hereby deleted in its entirety and replaced to read <br />as follows: <br />(5) Sidewalks. <br />Coding: Words in • • -. . type are deletions from existing law. <br />Words underlined are additions. <br />23 <br />