My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-09
CBCC
>
Ordinances
>
1990'S
>
1998
>
1998-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2019 10:36:13 AM
Creation date
9/30/2015 3:52:37 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1998-09
Adopted Date
05/19/1998
Ordinance Type
Land Development Regulation Amendments
State Filed Date
05\26\1998
Entity Name
LDR Amendments Chapter 902; 911 ;934; 954; 956; 971
Bed and Breakfast Regulations and Various other Land Development
Subject
Zoning District Uses for RS-6 and RT-6
Codified or Exempt
Codified
Archived Roll/Disk#
2744
Supplemental fields
SmeadsoftID
967
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO, 98-0 9 <br />e. Roof Plan: Shall indicate roof tyke, slope, and any "visuallX <br />offensive elements" (as described in these requirements)and <br />descriptions of screening devices. <br />g_ Certification from the project architect or engineer that proposed <br />roof plans and elevation plans meet the SR 60 corridor <br />architectural/building standards. <br />2. Prior to site plan release, gpplicants shall submit to planning staff three sets <br />of the following and shall obtain planningstff approval of same: <br />Site <br />f. <br />Building <br />Elevations: <br />Shall include <br />building <br />Must <br />a. <br />site plan): <br />all exterior elevations, <br />including <br />site li htina 121an, as well <br />all <br />items affectingthe gpl2earance of the building <br />cut sheets <br />(written specifications <br />and pictorial representation <br />including: <br />design, <br />description <br />building <br />all site lighting fixtures. <br />This <br />roof <br />complete of exterior <br />materials, <br />exterior <br />buildingcolors, all loading zones, mechanical <br />and <br />electrical <br />equipment locations and their required screening <br />devices, <br />and <br />signs attached to buildings. <br />g_ Certification from the project architect or engineer that proposed <br />roof plans and elevation plans meet the SR 60 corridor <br />architectural/building standards. <br />2. Prior to site plan release, gpplicants shall submit to planning staff three sets <br />of the following and shall obtain planningstff approval of same: <br />b. Sign Elevations (minimum scale: 3/4" = 1'4" ): These are to be <br />detailed drawings of building and site signage, including all items <br />affecting the appearance of signs, including but not limited to.0 <br />dimensions, area in sq. feet, complete description of finish materials <br />and their colors, color samples (minimum size 3" x 5", using <br />Pantone Matching_ System' numbers with color number on back of <br />each sample) and method of illumination. This is required for all <br />outdoor signs except those which cannot be determined because the <br />occupancy of the space is not known. Any signs not reviewed at site <br />plan review time for this reason must be reviewed under these <br />requirements prior to the issuance of a sign permit. <br />c. Building Color samples (minimum sample sizes: 3" x 5" l: Exterior <br />and exterior signage color samples shall be submitted. <br />CIO Certification from the project architect or engineer that the proposed <br />site/exterior building lighting, proposed signage, and proposed <br />building and signage colors meet the SR 60 corridor lighting, <br />signage, and color standards. <br />U Approval for Change of Exterior Design Required: Changes to the exterior of any <br />structure in the SR 60 Corridor that was originally required to comply with these <br />special SR 60 corridor requirements shall require review and approval by the <br />communi , development department. Such changes shall include, but not be <br />limited to, colors, building materials, roof finishes, and signage. Routine <br />maintenance and replacement of materials which do not affect the approved <br />exterior design shall be exempt from such review and approval. <br />Coding: Words in strike4trou type are deletions from existing law. Words underlined are <br />additions. <br />30 <br />Site <br />Lighting <br />Plan (maybe incorporated <br />into <br />Must <br />a. <br />site plan): <br />indicate <br />site li htina 121an, as well <br />as a light fixture schedule <br />with <br />cut sheets <br />(written specifications <br />and pictorial representation <br />including <br />photometric chart) <br />for <br />all site lighting fixtures. <br />This <br />includes <br />fixtures <br />any site lighting <br />attached to buildings. <br />b. Sign Elevations (minimum scale: 3/4" = 1'4" ): These are to be <br />detailed drawings of building and site signage, including all items <br />affecting the appearance of signs, including but not limited to.0 <br />dimensions, area in sq. feet, complete description of finish materials <br />and their colors, color samples (minimum size 3" x 5", using <br />Pantone Matching_ System' numbers with color number on back of <br />each sample) and method of illumination. This is required for all <br />outdoor signs except those which cannot be determined because the <br />occupancy of the space is not known. Any signs not reviewed at site <br />plan review time for this reason must be reviewed under these <br />requirements prior to the issuance of a sign permit. <br />c. Building Color samples (minimum sample sizes: 3" x 5" l: Exterior <br />and exterior signage color samples shall be submitted. <br />CIO Certification from the project architect or engineer that the proposed <br />site/exterior building lighting, proposed signage, and proposed <br />building and signage colors meet the SR 60 corridor lighting, <br />signage, and color standards. <br />U Approval for Change of Exterior Design Required: Changes to the exterior of any <br />structure in the SR 60 Corridor that was originally required to comply with these <br />special SR 60 corridor requirements shall require review and approval by the <br />communi , development department. Such changes shall include, but not be <br />limited to, colors, building materials, roof finishes, and signage. Routine <br />maintenance and replacement of materials which do not affect the approved <br />exterior design shall be exempt from such review and approval. <br />Coding: Words in strike4trou type are deletions from existing law. Words underlined are <br />additions. <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.