Laserfiche WebLink
ORDINANCE NO. 98m 0 9 <br />(6) Landscaping <br />The countywide landscaping requirements of LDR Chapter 926 shall apply except as <br />noted herein. <br />La) Increased Canopy Tree Size <br />All canopy trees required under normal landscaping and buffering requirements <br />and special SR 60 corridor plan requirements for projects within the corridor shall <br />have a minimum height of 12' and minimum spread of 6' at time of planting Palm <br />tree clusters may be used as canopy trees as specified in the landscape ordinance. <br />However, such palm trees shall have a minimum clear trunk of 12' . <br />Within the corridor plan area, the following landscape buffer shall be provided <br />along the entire length of a site's SR 60, 43rd Avenue, 58th Avenue, 66th Avenue, <br />74th Avenue, 82nd Avenue, 90th Avenue, and 98th Avenue frontages, except for <br />approved driveways: <br />Minimum Planting/Berm <br />Buffer Depth Requirements per 100' <br />4 canopy trees <br />5 understory trees <br />20' or more Continuous hedge: 1'/2'-2'/2' <br />high at planting <br />Berm: 1'/2'-3' high' <br />4.5 canopy trees <br />5.5 understory trees <br />15' Continuous hedge': 1'/2 -3' <br />high at planting <br />Berm: 1'-2'/i high' <br />5 canopy trees <br />6 understory trees <br />10 Continuous hedge': 2'/2'-3' <br />high at planting <br />Berm: 1'-1'/2' high' <br />Protect sites with a depth from SR 60 or a Thoroughfare Plan road of 250'400' <br />shall have a buffer depth of at least 15'. Sites with a depth over 400' shall have a <br />buffer depth of at least 20'. <br />(See Figures F-4 and F-5 at end of section 911.18. "Wabasso Corridor <br />Regulations") <br />'-NOTE: The hedge and berm combination shall provide a visual screen 4' high <br />above the grade of the project site parking area. Hedge material shall provide full <br />screeningto o the ground: therefore, wax myrtles and shrubs with similar leafing <br />characteristics shall not be used for hedge material unless a double row <br />arrangement is used. At the time of a certificate of occupancy (CO) for the project <br />site, the combination of berming and hedgingshall a 4' visual screen, <br />Coding: Words in strtke4hrou type are deletions from existing law. Words underlined are <br />additions. <br />31 <br />