My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-038
CBCC
>
Ordinances
>
2000's
>
2005
>
2005-038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2017 2:59:45 PM
Creation date
9/30/2015 3:39:13 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2005-038
Adopted Date
09/13/2005
Ordinance Type
Comprehensive Plan Amendment
State Filed Date
09\27\2005
Subject
Capital Improvements Element
Archived Roll/Disk#
3126
Supplemental fields
SmeadsoftID
714
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Capital Improvements Element <br />of time between development or redevelopment and the scheduled construction of the <br />capital improvements as specified in Section 163.3180(15)(c), F.S. <br />Regulation <br />No development order shall be issued for any project where the project's demand in conjunction with <br />existing demand and committed demand will exceed the capacity of a facility at the service level <br />established in this plan. Level -of -service analysis will be undertaken during the review of each <br />project for which development order approval is required. <br />Monitoring System <br />To effectively implement the concurrency requirement, it is necessary to maintain an estimate of <br />available capacity for each public facility subject to level -of -service requirements. By maintaining an <br />accurate and current available capacity estimate for each facility, projected demand from development <br />applications can be compared to the available capacity for the facility to determine if the project can <br />be approved. The purpose of the monitoring program is to maintain a current estimate of available <br />capacity for each facility. <br />The monitoring system portion of the concurrency management plan is maintained by the county's <br />planning division. Using a network computer system and data base management software, records <br />were developed and are maintained for each specific facility. <br />Based upon information in the specific comprehensive plan elements, total capacity figures for each <br />applicable facility are maintained in data base files established for each public facility category. <br />Capacity figures are modified as facilities are expanded or as criteria specified in the availability of <br />capacity section are met, thereby allowing a programmed expansion to be considered for capacity <br />determination purposes. Through contact with other county departments, planning staff are able to <br />modify capacity estimates as soon as facility characteristics are changed. <br />Table 6 17 depicts the general structure of the monitoring system data base file for each public facility <br />category. This table shows that available capacity for each specific facility is a function of total <br />capacity less existing demand and less committed demand. The demand section of this concurrency <br />management plan identifies the methodology for assessing demand. <br />Community Development Department Indian River County <br />Supplement lt ; Ordinance 2005- <br />47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.