My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-042
CBCC
>
Ordinances
>
2000's
>
2006
>
2006-042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:01:50 PM
Creation date
9/30/2015 4:13:48 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2006-042
Adopted Date
12/12/2006
Agenda Item Number
9.A.1.
Ordinance Type
Capital Improvements Element Amendment
State Filed Date
12\27\2006
Entity Name
Oslo 27 LLC
Subject
Four Laning 43rd Avenue from 13th St. SW to 17th St. SW
Archived Roll/Disk#
3126
Supplemental fields
SmeadsoftID
1613
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Capital Improvements Element <br />Table 6.17: Monitoring System Design <br />Public Facility <br />Specific <br />Total Capacity <br />Existing Demand <br />Committed Demand <br />Available Capacity <br />Category <br />Facilities <br />Annually <br />Identify existing flows for each water and sewer treatmenplant <br />Utilities <br />Annually <br />Estimate Landfill (active cell) volume used <br />Utilities <br />Peak season/ <br />Annual count (average) <br />Volume estimated from <br />(Total Capacity) - <br />Traffic. <br />Roadways <br />peak direction/ <br />peak hour (LOS <br />(peak season/peak <br />approved Development <br />(Existing Demand) - <br />Add estimated demand for new projects to committed demand total upon issuance of DO <br />Planning <br />D) <br />direction/peak hour) <br />Orders (DO) <br />(Committed Demand) <br />Volume estimated from <br />(Total Capacity) - <br />Sanitary Sewer <br />Treatment Plants <br />Design flows <br />Existing flows <br />approved DO's <br />(Existing Demand) - <br />(Committed Demand) <br />Volume estimated from <br />(Total Capacity)- <br />Potable Water <br />Treatment Plants <br />Design flows <br />Existing flows <br />approved DO's <br />(Existing Demand)- <br />(Committed Demand) <br />Active cell <br />Volume estimated from <br />(Total Capacity) - <br />Solid Waste <br />Landfill <br />design capacity <br />Active cell volume used <br />approved DO's <br />(Existing Demand) - <br />(Committed Demand) <br />(Acres per thousand <br />(Acres per thousand <br />population) X (projected <br />(Total Capacity) - <br />Recreation <br />Parks <br />Park Acreage <br />population) X (existing <br />population for approved <br />(Existing Demand) - <br />population) <br />DO's) <br />(Committed Demand) <br />Drainage <br />Volume of stormwater <br />(Total Capacity) - <br />Drainage <br />Volume <br />Existing flows <br />allowed to ottfall for <br />(Existing Demand)- <br />conveyances <br />approved DO's <br />(Committed Demand) <br />To implement the monitoring system, the following actions shown in table 6.18 will be necessary. <br />Table 6.18: Monitoring System Tasks <br />Action <br />Responsible <br />Department <br />Timing <br />Do quarterly traffic counts for thoroughfare plan roads to determine existing demand <br />Engineering <br />Annually <br />Compile quarterly ridership statistics for all fixed routes <br />MPO <br />Annually <br />Identify existing flows for each water and sewer treatmenplant <br />Utilities <br />Annually <br />Estimate Landfill (active cell) volume used <br />Utilities <br />Annually <br />Estimate population and apply park standard to determine park existing demand <br />Planning <br />Annually <br />Estimate existing flows for drainage conveyances <br />Engineerirg <br />Annually <br />Enter data received from other departments into computer <br />Planning <br />Ongoing <br />Add estimated demand for new projects to committed demand total upon issuance of DO <br />Planning <br />Ongoing <br />Maintain records of units/projects receiving a certificatef occupancy, maintain demand <br />estimates from those units/projects, subtract estimated demand for those units/projects for <br />committed demand once existing demand is updated <br />Planning <br />Ongoing <br />Community Development Department Indian River County <br />48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.