Laserfiche WebLink
ON MOTION BY COMMISSIONER SIEBERT, SECONDED BY <br />COMMISSIONER MASSEY, THE BOARD UNANIMOUSLY APPROVED THE CONTRA Cf <br />FOR COURTHOUSE ALTERATIONS AND AUTHORIZED THE SIGNATURE OF THE <br />CHAIRMAN. <br />ARTICLE 1 <br />THE CONTRACT DOCUMENTS <br />The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other <br />Conditions), Drawings, Specifications, all Addenda issued prior to execution of this Agreement and all Modifications <br />issued subsequent thereto. These form the Contract, and all are as fully a part of the Contract as if attached to this <br />Agreement or repeated herein. An enumeration of the Contract Documents appears in Article 8. <br />ARTICLE 2 <br />THE WORK <br />The Contractor shall perform all the Work required by the Contract Documents for <br />COURTHOUSE ALTERATIONS: <br />FOR <br />BOARD OF COUNTY COMMISSIONERS <br />(lawt above the caption descriptive of the Work as used on other Contract Documents.) <br />ARTICLE 3 <br />ARCHITECT <br />The Architect for this Project is JOHN J. SCHLITT, JR., AIA <br />2110 5th Avenue <br />Vero Beach, Florida 32960 <br />• ARTICLE 4 . <br />TIME OF COMMENCEMENT AND COMPLETION <br />The Work to be performed under this Contract shall be commenced ten' days after signing <br />of contract <br />and completed within 100 days. <br />(tfere insert any special provisions for liquidated damages relating to fallure to complete on timeJ <br />AIA DOCUMENT A101 • OWNER -CONTRACTOR AGREEMENT • SEPTEMBER 1967 EDITION • AIA® <br />01967 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 N. Y. AVE., N.W., WASH., D. C. 20006 <br />34 — <br />eoo� 19 PACA99 <br />2 <br />