Laserfiche WebLink
ORDINANCE 2008- 011 <br />existed prior to implementation of school concurrency where either (1) no certificate <br />of occupancy has been issued or (2) a certificate of occupancy has been issued since <br />the last fall FTE. <br />1. At the fall FTE, the vested number of students will be reduced by the number of <br />students represented by the vested residential units that received certificates of <br />occupancy within the previous twelve (12) month period. <br />2. If a proposed residential development causes the adopted level of service to be <br />exceeded in the school service area in which the proposed residential development is <br />located, the available capacity in the adjacent school service area(s) shall be used. <br />3. The determination of available capacity shall be made by the school district. That <br />determination shall be stated in a School Capacity Availability Determination Letter <br />(SCADL), as required in the adopted "Interlocal Agreement for Coordinated <br />Planning and School Concurrency". Each SCADL shall state the total number and <br />type of residential units for which school capacity is available and shall be sent to <br />the coordinating agency (community development) and the applicant. <br />(d) Public school facilities concurrency test. <br />The test for public school facilities concurrency shall be a comparison of project demand <br />and available capacity. A project shall be deemed to meet public school facilities <br />concurrency if available capacity exceeds project demand. <br />(e) Public school facilities monitoring. <br />In accordance with the adopted "Interlocal Agreement of Coordinated Planning and <br />School Concurrency", the school district shall maintain a database by school service area <br />for existing and programmed school facilities, capacities committed through proportionate <br />share mitigation agreements, FISH capacities, student enrollment, vested students by <br />development project together with the duration of time vested, certificates of occupancy <br />issued for vested residential units by project (subdivision), and available capacity. <br />Data requirements. <br />(a) Applicant submissions. <br />1. All applications for conceptual or initial concurrency determination shall be <br />submitted on a form provided by the community development department and <br />shall include sufficient information for the staff to determine whether the impact <br />of such development is consistent with these concurrency evaluation criteria. <br />Such information shall include, but not be limited to: <br />a. Identification of the total number and type of dwelling units for residential <br />development applications; <br />b. Identification of type and intensity of nonresidential use, where <br />appropriate, at a level of detail consistent with the type of development <br />application; <br />Bold Underline: Additions to Ordinance <br />S4f+'t ugh Deleted Text from Existing Ordinance <br />F:\Community Development\Users\CurDev\ORDINANCE\2008\2008- <br />School Concurrencychanges.doc <br />6 <br />